BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 28, 2024 at 8:00 PM

Updated September 29, 2024

Site work and paving for a mixed-use development in Sedona, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

A compacted decomposed granite shared use path with concrete/paver driveway crossings will connect the existing shared use path and will run south approximately 4,039 feet. Terminating at the driveway of 825 Dry Creek Road. CONTRACT TIME: 96 calendar days (including Notice to Proceed date)

Bid Results

Roads / Highways

$427,116.00

Public - City

Paving, Site Work

7

7

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
8
Bidding Soon
117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2024

September 25, 2024

Project location map

Dry Creek Rd, Sedona, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.