Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Saint Louis, Missouri. Completed plans call for the renovation of a water / sewer project.
Question Deadline 09/02/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. The work to be done under these Contract Documents consists of the removal of approximately 902,000 cubic feet of PVC trickling filter media and surface grating from two trickling filters (Trickling Filter #1 and Trickling Filter #2) at the Bissell Point WWTF and replacement with new media and grating. Each trickling filter is 134-ft diameter by 32-ft media depth. Also included in the work for these two trickling filters is the removal of trickling filter wall liner system and replacement with new liner system; the geomembrane liner portion of the liner system is District-supplied; repairs to FRP ductwork and replacement of supports; the new ductwork supports are District-supplied; removal and replacement of drive unit parts; concrete trickling filter repairs and recoating; removal of one trickling filter center mast, and replacement with new center mast (center mast removal and replacement for Trickling Filter #1); the new center mast is District-supplied. Additional work includes replacement of rotary distributor drive controls, including new VFDs and panel and associated instrumentation, electrical and wiring requirements for six trickling filters. MSDs Bissell Point WWTF Trickling Filter Media Replacement Phase II
Post-Bid
Water / Sewer
$17,650,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
September 16, 2024
November 15, 2024
June 18, 2026
10 E Grand Ave, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Aug 28 2024
Saint Louis, MO
Bid Date: Sep 17 2024
Saint Louis, MO
Bid Date: Sep 24 2024
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Sep 11 2024
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Sep 03 2024
Saint Louis, MO
Bid Date: Aug 28 2024
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Oct 01 2024
Saint Louis, MO
Bid Date: Sep 13 2024
Saint Louis, MO
Bid Date: Sep 20 2024
Saint Louis, MO
Bid Date: Sep 20 2024
Saint Louis, MO
Bid Date: Aug 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--