Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 27, 2024 at 8:00 PM

Updated September 28, 2024

Remodeling of a medical facility in Benton City, Washington. Working plans call for the remodel of a medical facility.

Converting Open Work Space into 3 Offices Safety Protocol to seal off reconstruction area from occupied work area. Project to begin no later than September 30, 2024 Contact information added.

Final Planning

Medical

$110,000.00

Public - City

Remodeling

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
24
Bidding Soon
582
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2024

September 30, 2024

Project location map

701 Dale Ave, Benton City, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed