BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2026 at 7:00 PM

Updated January 17, 2026

Site work and paving for a bridge / tunnel in Newington, New Hampshire. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Maine Department of Transportation is seeking Letters of Interest from contractors to become prequalified to bid and to participate in a project review process. RFIs may be emailed directly to RFI-Contracts.MDOT@maine.gov with the subject of "RFI - Sarah Mildred Long Bridge Project - 26172.00". Answers will be posted as 'Amendments' on the website with this Notice. Bidders shall not contact any other departmental staff. The Department will not be responsible for any answers given or information not posted on the website. RFIs will be received up to 12:00 noon of the Wednesday prior to the submission deadline. Contractors will be informed of their prequalification status by Friday, February 6, 2026 MEDOT : RFQ Contractor - Sarah Mildred Long Bridge Project PROJECT DESCRIPTION MaineDOT is currently in the design phase for this project. The Department intends to develop and finalize recommendations resulting from this contractor interface process and will advance designs to the PS&E stage for advertising in the 2nd quarter of 2027. This project specific prequalification invites input from the contracting community to help meet key construction goals including minimizing traffic impacts, reducing bidder's risk, and reducing cost. The project location, traffic impacts, contractor access and material handling, rigging and installation, and scope of work are significant, requiring anticipation and understanding of the design and its impact to construction. The purpose of this rehabilitation project is to replace the uphaul and downhaul span operating ropes at all four lift span towers. Replacement will include temporary access to counterweights, removal of the existing operating rope assemblies, installation of new ropes, pre-tensioning and field testing. The ropes will be installed in the existing configuration. These wire ropes are wrapped around operating drums at the base of each tower and attach to the top (downhaul) and bottom (uphaul) of the counterweight, also located within the tower. The review process will focus on the following: Review of construction procedure alternatives o Consideration of lift span location during rope replacement o Discuss installation details Site access including laydown area Time requirements Maintenance of traffic requirements

GC Bidding

Bridges / Tunnels

$795,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
527
Active Projects
279
Bidding Soon
2,812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

February 27, 2026

Project location map

US-1 BYP, Newington, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.