BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2024 at 8:00 PM

Updated October 4, 2024

Site work for a water / sewer project in Newington, New Hampshire. Working plans call for site work for a water / sewer project.

**As of October 03, 2024, This request for bids is temporarily withdrawn. It is expected to be re-posted by the end of 2024 for an early spring 2025 construction project Addenda to this bid document, including response to questions submitted will not be provided directly to bidders, but will be posted on the City's website, under the project heading by 4:00 pm on September 25, 2024 Furnish and install approximately 4,300 LF of new 8" ductile iron water main Replace 25 water services Replace four (4) hydrant assemblies Permanent trench repairs where roadway is impacted by pipe installations The work includes Furnish and install approximately 4,300 LF of new 8 ductile iron water main Replace 25 water services Replace four (4) hydrant assemblies Permanent trench repairs where roadway is impacted by pipe installations Liquidated damages shall be in the amount of $1,000.00 for each calendar day beyond the date established for substantial Addenda to this bid document, including response to questions submitted will not be provided directly to bidders, but will be posted on the Citys website, under the project heading by 4:00 pm on September 25, 2024 The Owner reserves the right to reject any or all bids, to accept any bid, to waive any informality on bids received, and to take any action that it may deem to be in the best interest of the Owner. Completion time for the project will be 75 days for substantial completion and 90 days for final completion from the date specified on the Notice to Proceed. A Bid must be accompanied by Bid security made payable to Owner in an amount of TEN (10%) percent of Bidders maximum Bid price and in the form of a certified check or bank money order The successful bidder must furnish 100% Performance and Payment Bonds in the Citys standard format (Section B-3 and B-4 respectively) and will be required to execute the Contract Agreement within 10 days following notification of the acceptance of the Bid.

Final Planning

Water / Sewer

$300,000.00

Public - City

Site Work

12

18

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
403
Active Projects
173
Bidding Soon
3,102
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2024

April 4, 2025

Project location map

Little Bay Rd, Newington, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.