BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a pre-engineered storage facility in Springfield, Oregon. Completed plans call for the renovation of a 3,360-square-foot, one-story above grade pre-engineered storage facility.

The work described in these specifications includes construction of a masonry and steel-framed storage building and associated site improvements including limited grading, paving, and utility installation for OWNER. The CONTRACTOR shall supply all materials, labor, appurtenances, equipment and incidentals necessary, and permits (as required) and shall perform all operations required to finish the work under this contract. Note: This work is Prevailing Wage as determined by BOLI, July 2024 book. All Requests for Qualification shall be sent directly to David Looney, P.E., by email at DavidL@subutil.com. PROPOSALS SUBMITTED BY A NON-QUALIFIED GENERAL CONTRACTOR (BIDDER) SHALL BE CONSIDERED NON-RESPONSIVE AND SHALL BE REJECTED. First-tier and other subcontractors must be accepted by Springfield Utility Board prior to the preconstruction meeting. The minimum qualifications and submittal requirements are specified in the Contract Documents. Requests for Qualification shall be presented to Engineer no later than 2 p.m., Pacific Standard Time, Thursday, August 22, 2024. if Deemed appropriate by the engineer, questions that cannot be addressed by direct reference to the bidding Documents will be the subject of an addendum. A bidder's failure to attend the pre-bid meeting shall Cause any bid submitted by that bidder to be deemed non-responsive and the bid will be returned Unopened. If not included in the bid packet, First-Tier Subcontractor Disclosure forms will be received at the above-mentioned location by mail, calling and delivering or via email by . The intent to award will be posted to the SUB bidding website. Proposals must be submitted on the prescribed forms and must be accompanied by certified check, cashier's check, or bid bond executed in favor of Springfield Utility Board in an amount not less than 5 percent (5%) of the amount bid. The successful bidder will be required to furnish to Springfield Utility Board a performance bond and a payment bond each equal to one hundred percent (100%) of the amount of the bid. The successful bidder and all subcontractors will be required to furnish to the Oregon Construction Contractors Board a public works bond in the amount of $30,000, unless exempt under ORS 279C. Acceptance of bids and award of contract will follow procedures provided by Oregon Public Contracting Code (ORS 279A, 279B, 279C) and in accordance with all applicable Springfield Utility Board policies. The options for sealed bid proposal packet delivery are as follows: 1) Mail in to the above address and recipient; 2) Drop off at the address during business hours and call the recipient at 541-726-2396 to make aware of the delivery; or 3) Submitted through electronic means to the following email address: RebeccaW@subutil.com. Any of these options must be delivered prior to the CPPB for the Springfield Utility Board Water Division, 202 South 18th Street, Springfield, Oregon 97477 . No proposal will be considered by the Springfield Utility Board unless the Bidder agrees to be bound by and will comply with the provisions of ORS 279C.800 to 279C.870 and 40 U.S.C. 276(a) pertaining to prevailing wages, as applicable. Each bid must contain a statement as to whether or not the bidder is a resident bidder as defined in ORS 279A.120. Each bid must also contain a statement as to whether the bidder is registered with the Oregon Construction Contractors Board. No bid will be received or considered unless the bidder is registered with the Construction Contractors Board, as required by ORS 701.035.ET.SEQ. Faxed copies will NOT be accepted. Special minimum experience qualifications apply to portions of this project. Contractors (Bidders) shall submit to the Engineer a Request for Qualification complying in form and content to the requirements of the bid documents. Springfield Utility Board reserves the right to reject any and all bids, to waive any irregularities, and to accept the bid deemed in the best interests of Springfield Utility Board. Springfield Utility Board may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the agency it is in the public interest to do so. Estimated construction cost range of $600,000 - $800,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/23/2024 at 2:00 PM PT **Bineham Construction requests sub bids no later than end of business on September 3, 2024.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$549,653.00

Public - City

Renovation

19

17

32

4

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
11
Bidding Soon
174
All Active Projects
76
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2024

September 26, 2024

img_map_placeholder

1295 S 26th St, Springfield, OR

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.