Site work for a water / sewer project in Sunset, Utah. Working plans call for site work for a water / sewer project.
Sunset City Waterline Project PROJECT LOCATION: On the south side of 1800 North in Central Park from 250 West installing waterline to east across Central Park in Sunset City. DESCRIPTION OF BID WORK: The work includes furnishing ail labor, tools, materials, equipment, transportation, and services. required for construction of the abovd projeets; consisting of the following items of work: mobilization; obtaining all bonds .and insurance; furnishing & installing approximately 1,080-feet of 10-tnch pvc culinary waterline; gate valves*. furnishing & installing fire hydrants, and all appurtenant work in accordance with the Drawings and Specifications prepared by the. Engineer, CEC, Civil Engineering Consultants, PLLC. ESTIMATE: The Engineer's Estimate of Cost for the total project is 332000 PROJECT ADMINISTRATION: Questions in regards to the proposed project shall be directed to the Engineer, as noted above. No drawing, specifications, product substitution and/or interpretations will be made unless noted with an "Addendum". PRE-BID MEETING: A pre-bid meeting for this project will NOT BE HELD. The contractor is encouraged to visit the site BID SECURITY: Ail bids must be accompanied by a Bid Bond, Certified Check or Cashier's Check in the amount of 5% of the maximum bid price, drawn payable to: the. ordey of Owner noted herein. BID GUARANTEE: All Bids submitted shall be in conformance. with the Instructions to Bidders and shall be guaranteed by the Bidder for a period of sixty (60) days from tile date ofBid Opening. OWNER'S RIGHTS RESERVED: The Owner hereby; reserves the right to reject any or all bids presented, to waive any informality in a bid, and to make award or refuse in the interest of the Owner, PROJECT CONTRACT TIME: All proposed work contained in the contract documents shall be completed by the following: a. Work performed in 250West Street shall be complete by 15"1 October 2024; b. Work performed for tire remaining waterline installation shall be complete by 15;lh December 2024 after the Notice to Proceed is Issued. LIQUIDATED DAMAGES: Liquidated damages or project delay charges will be -issued for work not completed on time per the contract documents.
Final Planning
Water / Sewer
$332,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.