BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sunset, Utah. Working plans call for site work for a water / sewer project.

Sunset City Waterline Project PROJECT LOCATION: On the south side of 1800 North in Central Park from 250 West installing waterline to east across Central Park in Sunset City. DESCRIPTION OF BID WORK: The work includes furnishing ail labor, tools, materials, equipment, transportation, and services. required for construction of the abovd projeets; consisting of the following items of work: mobilization; obtaining all bonds .and insurance; furnishing & installing approximately 1,080-feet of 10-tnch pvc culinary waterline; gate valves*. furnishing & installing fire hydrants, and all appurtenant work in accordance with the Drawings and Specifications prepared by the. Engineer, CEC, Civil Engineering Consultants, PLLC. ESTIMATE: The Engineer's Estimate of Cost for the total project is 332000 PROJECT ADMINISTRATION: Questions in regards to the proposed project shall be directed to the Engineer, as noted above. No drawing, specifications, product substitution and/or interpretations will be made unless noted with an "Addendum". PRE-BID MEETING: A pre-bid meeting for this project will NOT BE HELD. The contractor is encouraged to visit the site BID SECURITY: Ail bids must be accompanied by a Bid Bond, Certified Check or Cashier's Check in the amount of 5% of the maximum bid price, drawn payable to: the. ordey of Owner noted herein. BID GUARANTEE: All Bids submitted shall be in conformance. with the Instructions to Bidders and shall be guaranteed by the Bidder for a period of sixty (60) days from tile date ofBid Opening. OWNER'S RIGHTS RESERVED: The Owner hereby; reserves the right to reject any or all bids presented, to waive any informality in a bid, and to make award or refuse in the interest of the Owner, PROJECT CONTRACT TIME: All proposed work contained in the contract documents shall be completed by the following: a. Work performed in 250West Street shall be complete by 15"1 October 2024; b. Work performed for tire remaining waterline installation shall be complete by 15;lh December 2024 after the Notice to Proceed is Issued. LIQUIDATED DAMAGES: Liquidated damages or project delay charges will be -issued for work not completed on time per the contract documents.

Final Planning

Water / Sewer

$332,000.00

Public - City

Site Work

13

6

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
27
Bidding Soon
548
All Active Projects
255
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2024

February 22, 2025

img_map_placeholder

UT-37, Sunset, UT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.