BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 16, 2024 at 8:00 PM

Updated August 28, 2024

Site work and paving for a civil project in Brunswick, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Contractor needs to contact Advanced Engineering @ (715) 552-0330 email; info@aec.engineering to get the bidding documents and further info about the project. The Rim Rock resurfacing/reconditioning project will reestablish the right of way by removing trees, regrading ditch lines and installing culvert crossings throughout the project. Unsuitable and poor subsoils will be removed and replaced prior to the existing roadway being pulverized. The reshaping, crowning and pulverization will be completed before contractors are to import approximately 4-inches of in place & compacted gravel; the roadway will be surfaced with 3" of HMA installed in 2 lifts. Due to ditch grading and restoring the right-of-way there will be lawn & grass restoration taking place by use of seeding, mulching, and erosion matting. Project will be completed by installation of 24-inches of shoulders on both sides of the road. The first lift of asphalt shall be installed by October 25th, 2024. Project shall be completed by June of 2025. The Town of Brunswick reserves the right to accept or reject any and all bids.

Post-Bid

Roads / Highways

$70,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
28
Bidding Soon
517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

October 25, 2024

Project location map

Rim Rock Rd, Brunswick, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.