Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Spring City, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of October 17, Project has been awarded. Award amount is $102,756.25** After bids are opened, a public notice will be issued via online containing any available bid results. This project involves the reconstruction of three roadways within the Borough. The following roads will be milled and overlayed: S Main Street between Walnut Street and Pikeland Avenue (450 FT +/-), Earl's Alley from S Church Street to the crest of the hill (450 FT +/-), and Gay Street from S Main Street to the Schuylkill River Trail crossing (330 FT +/-). This project will have various areas of base repair and crosswalk striping. The roadway paving and repair portion of the project will include hauling, equipment and labor only. All of the Superpave asphalt material required for this project will be purchased directly by the BOROUGH. The successful bidder will be required to pay the online Program a fee of 1/3% of the contract value award. There is a minimum award fee of $100.00 and a maximum of $5,000.00. Proposals shall be accompanied by a Bid Bond in the amount of ten percent (10%). Proposals shall be effective for 90 days from the date of opening. The successful low bidder will be required to provide a Performance Bond equal to one hundred percent (100%), a Labor and Material Payment Bond equal to one hundred percent (100%), a worker's compensation affidavit, and a certificate of insurance naming SPRING CITY BOROUGH and LTL Consultants, Ltd. as additional insureds, all within 20 days after the contract is awarded. A Maintenance Bond equal to fifteen percent (15%) of contract price and extending for a period of 18 months after substantial completion is required. SPRING CITY BOROUGH reserves the right to waive any non-material defects or irregularities in the bid, and to reject any or all bids or portions thereof. SPRING CITY BOROUGH, in accordance with Title VI of the U.S. Civil Rights Act of 1964 and Parts 21 and 23 of 49 C.F.R., notifies all bidders that it will affirmatively ensure that MBE/WBE will be afforded full opportunity to submit bids in response to this invitation and that no person will be discriminated against on the grounds of race, color, sex or national origin in consideration for an award. Project is to be substantially completed by TUESDAY, OCTOBER 15, 2024. Liquidated damages apply at the rate of $400.00 per calendar day. Proposals must include the Public Works Employment Verification Form completed by the Bidder. Notice is hereby given to bidders that this project is subject to the provisions of the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442, P.L. 987), as amended. Questions Due Date: Aug 23rd 2024, 11:00 AM EDT Deadline to submit Questions at Online Portal The project takes place at three locations along Jaine Lane and involves the installation of new storm pipes, structures, riprap aprons, the installation of drainage swales, the grading of gravel roadways, the replacement of a culvert over a tributary to Birch Run, grading cut and fill and paving of a roadway. All of the Superpave asphalt material for this project will be purchased directly by the BOROUGH.
Award
Roads / Highways
$102,756.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2024
September 17, 2024
Multiple Locations, Spring City, PA
Related To This Project
Spring City, PA
Bid Date: Oct 25 2024
Spring City, PA
Bid Date: Aug 27 2024
Spring City, PA
Bid Date: Jul 29 2024
Spring City, PA
Bid Date: Apr 09 2024
Spring City, PA
--
Spring City, PA
Bid Date: Nov 09 2023
Spring City, PA
Bid Date: Oct 30 2023
Spring City, PA
Bid Date: May 31 2023
Spring City, PA
Bid Date: Apr 24 2023
Spring City, PA
Bid Date: Jun 29 2022
Spring City, PA
Bid Date: Aug 18 2022
Spring City, PA
Bid Date: Apr 27 2022
Spring City, PA
Bid Date: Dec 03 2019
Spring City, PA
Bid Date: Mar 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.