BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated August 5, 2025

Site work and paving for a road / highway in San Jose, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Notice is hereby given that VTA is now soliciting Statements of Qualifications (SOQ) from bidders (Bidders) with construction expertise to furnish all labor, materials, tools, equipment, services, supervision, and incidentals necessary to convert the existing High Occupancy Vehicle (HOV) lanes to Express Lanes (previously known as High Occupancy Toll (HOT) lanes) along US 101 from near Metcalf Road to the US 101/SR 85 Separation, and along SR 85 from the US 101/SR 85 Separation to Almaden Expressway Undercrossing in San Jose. The project limits are approximately 2 miles within a portion of US 101 and 6 miles within a portion of SR 85., as further described in the scope in the Technical Specifications of the Invitation for Bid documents (to be posted to public in the coming days). This posting is for pre-qualification purposes only. Once the project is advertised, there will be a separate link for bidders to bid on that projects. Bidders must be pre-qualified in order to bid on the project. To convert the existing High Occupancy Vehicle (HOV) lanes to Express Lanes (previously known as High Occupancy Toll (HOT) lanes) along US 101 from near Metcalf Road to the US 101/SR 85 Separation, and along SR 85 from the US 101/SR 85 Separation to Almaden Expressway Undercrossing in San Jose. The project limits are approximately 2 miles within a portion of US 101 and 6 miles within a portion of SR 85. The Engineer's Estimate for this Work ranges from $25,000,000 to $30,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated time for construction of the Project is 1084 calendar days. Question Deadline 12/11/2024 at 2:00 PM PT

Award

Roads / Highways

$36,900,312.00

Public - County

Paving, Site Work

1

26

24

9

Subscribe For Documents

113 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
410
Active Projects
203
Bidding Soon
2,379
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

February 17, 2025

Project location map

Multiple Locations, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.