BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in San Jose, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Notice is hereby given that VTA is now soliciting Statements of Qualifications (SOQ) from bidders (Bidders) with construction expertise to furnish all labor, materials, tools, equipment, services, supervision, and incidentals necessary to convert the existing High Occupancy Vehicle (HOV) lanes to Express Lanes (previously known as High Occupancy Toll (HOT) lanes) along US 101 from near Metcalf Road to the US 101/SR 85 Separation, and along SR 85 from the US 101/SR 85 Separation to Almaden Expressway Undercrossing in San Jose. The project limits are approximately 2 miles within a portion of US 101 and 6 miles within a portion of SR 85., as further described in the scope in the Technical Specifications of the Invitation for Bid documents (to be posted to public in the coming days). This posting is for pre-qualification purposes only. Once the project is advertised, there will be a separate link for bidders to bid on that projects. Bidders must be pre-qualified in order to bid on the project. To convert the existing High Occupancy Vehicle (HOV) lanes to Express Lanes (previously known as High Occupancy Toll (HOT) lanes) along US 101 from near Metcalf Road to the US 101/SR 85 Separation, and along SR 85 from the US 101/SR 85 Separation to Almaden Expressway Undercrossing in San Jose. The project limits are approximately 2 miles within a portion of US 101 and 6 miles within a portion of SR 85. The Engineer's Estimate for this Work ranges from $25,000,000 to $30,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The estimated time for construction of the Project is 1084 calendar days.

GC Bidding

Roads / Highways

$30,000,000.00

Public - County

Paving, Site Work

1

17

4

3

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
69
Bidding Soon
1,464
All Active Projects
631
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

October 24, 2025

img_map_placeholder

Multiple Locations, San Jose, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.