Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 7, 2024 at 8:00 PM
Updated October 8, 2024
Demolition, site work and addition to a museum in Folly Beach, South Carolina. Completed plans call for the addition of a 24,000-square-foot, one-story above grade museum; for the demolition of a museum; and for site work for a museum.
******THE PLANS AND SPECIFICATIONS ON FILE ARE FOR "REVIEW ONLY". IN ORDER TO SUBMIT AN ELIGIBLE BID, CONTRACTORS ARE REQUIRED TO GET A COPY OF THE PLANS AND SPECIFICATIONS FROM DA ARCHITECTS.****** Award date: October 8,2024 A 330sf Addition To The Existing Community Center. The Work Includes Selective Site Preparation, Concrete Foundation And Slab, Masonry And Frame Wall & Roof Construction, Interior & Exterior Painted Finishes, Mini Split Hvac, Electrical Circuits, Sprinkler Extension, Roofing. Scope: a 330sf Addition to the Existing Community Center. The Work Includes Selective Site Preparation, Concrete Foundation and Slab, Masonry and Frame Wall & Roof Construction, Interior & Exterior Painted Finishes, Mini Split Hvac, Electrical Circuits, Sprinkler Extension, Roofing.
Award
Museum
$233,261.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2024
October 9, 2024
55 Center St, Folly Beach, SC
Related To This Project
Folly Beach, SC
Bid Date: Nov 25 2024
Folly Beach, SC
Bid Date: Dec 03 2024
Folly Beach, SC
Bid Date: Dec 04 2024
Folly Beach, SC
Bid Date: Jan 29 2025
Folly Beach, SC
Bid Date: Dec 02 2024
Folly Beach, SC
Bid Date: Jan 29 2025
Folly Beach, SC
Bid Date: Feb 13 2025
Folly Beach, SC
Bid Date: Mar 05 2025
Folly Beach, SC
Bid Date: May 14 2024
Folly Beach, SC
--
Folly Beach, SC
Bid Date: Jan 08 2024
Folly Beach, SC
Bid Date: Feb 10 2022
Folly Beach, SC
Bid Date: Feb 17 2022
Folly Beach, SC
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
