Published January 9, 2025 at 7:00 PM

Updated April 24, 2025

Site work for a civil project in Foresthill, California. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

In accordance with plans and specifications prepared by Northwest Hydraulic Consultants and Gannett Fleming, the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of structural modifications at the Owner's North Fork Long Canyon Diversion Dam and the South Fork Long Canyon Diversion Dam. Both dams are small concrete gravity dam structures which divert flows from the two upper forks of the Long Canyon Creek, into the Middle Fork Tunnel. This project includes precision structural demolition of existing concrete overflow spillways, diversion piping, and tunnel intake infrastructure to allow for major structural modifications including construction of a concrete approach apron, sediment maintenance gates, and tunnel intake modifications including concrete box culvert installation. The project will improve diversion and flow efficiency, sediment passage, downstream fish passage, and enhance aquatic and riparian habitat in the vicinity of the dams. Additional pre bid meeting note: Bids received from Bidders who did not sign the sign-in sheet and attend the meeting and walk-through will be returned to the Bidder unopened. Attendance by subcontractors is not mandatory, but all interested prospective subcontractors are encouraged to attend. The Owner will transmit such Addenda as Owner considers necessary in response to questions raised at the meeting and walk-through. Oral statements not confirmed by Addenda may not be relied upon and are not binding or legally effective. Except for mandatory walk-through, no other access to the project site will be granted pre-bid without the Owner's approval. During all site visits the Bidder must be accompanied full time by an authorized representative of the Owner. No exceptions. Written questions regarding the Contract Documents and/or the proposed Work should be sent to Kyle Dushane, PE, Deputy Director of Power Generation by e-mail only at kdushane@pcwa.net no later than October 31, 2024.

Award

Water / Sewer

$12,780,250.00

Public - County

Site Work

71

26

19

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
111
Bidding Soon
1,349
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

January 13, 2025

Project location map

Multiple Locations, Foresthill, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.