Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to an educational facility in Dodge City, Kansas. Completed plans call for the addition of a 18,110-square-foot educational facility; for the demolition of a educational facility; for site work for a educational facility; and for the renovation of a educational facility.
The Dod ge City High School addition is to be on the west most end of the current field house, and is approximately 18,110 square feet. The facility structure will be pre-engineered steel frame and the mechanical system will be rooftop units (RTUs). Exterior building materials will be metal panels that match existing and storefront glazing system. Interior spaces will include weight room, storage, restrooms, mechanical/ electrical room, custodial closet, mezzanine and auxiliary court or bowling alley. Attached are Conceptual Floor Plan and Building Elevations of the current scope of Work (Exhibit A-1 & A-2) USD 443 Dod ge City is requesting Qualification Statements and Price Proposals from interested and qualified construction firms for Construction Manager at-Risk (hereinafter referred to as "CMAR") services for the following Project: Dod ge City High School Addition City Contact: Simeon Russell Executive Director of Business Operations Address: Dod ge City Public Schools 2112 1 st Avenue Dod ge City, KS 67801 Telephone: 620-371-1001 e-mail: russell.simeon@usd443.org Questions and requests for clarifications must be submitted via e-mail to Simeon Russell, russell.simeon@usd443.org. No inquiries will be accepted after 2:00 p.m. on September 3, 2024. The preliminary estimated Project budget (including, but not limited to, construction cost and contingencies) is: TOTAL Proposed Amount $4,500,000 Project Delivery Method. The CMAR delivery method was selected by USD 443 Dod ge City to achieve the following objectives: a. Integrate the experience and expertise of the CMAR into a project team environment to successfully achieve USD 443 Dod ge City goals and objectives for the Project; b. Utilize the experience and expertise of the CMAR during the pre-construction phase to advise on constructability issues, alternate methods and materials, construction phasing, cost, quality, and schedule; and c. Utilize the experience and expertise of the CMAR during the construction phase for management of all construction activities including, but not limited to, bidding, subcontractor scheduling and coordination, quality, and budget and schedule control. Construction Start. March, 2025 (tentative) USD 443 Dod ge City has established the following goals and objectives for the project: 1) Provide a design that ensures high functionality and efficiency of operations for decades to come. 2) Provide a high-quality facility with durable, long-lasting materials. 3) Address energy efficiency to the greatest degree possible where financially feasible. 4) Adhere to the budget and schedule established for the Project. 5) Milestones that must be completed: Focus on Student Health Educational and athletic opportunities Construction Schedule Construction is anticipated to begin March, 2025. Construction is anticipated to be complete by October, 2025.
Post-Bid
Educational
$4,500,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2024
March 3, 2025
2201 W Ross Blvd, Dodge City, KS
Related To This Project
Dodge City, KS
Bid Date: Oct 16 2024
Dodge City, KS
Bid Date: Oct 23 2024
Dodge City, KS
Bid Date: Nov 12 2024
Dodge City, KS
Bid Date: Oct 30 2024
Dodge City, KS
Bid Date: Oct 31 2024
Dodge City, KS
Bid Date: Dec 19 2024
Dodge City, KS
--
Dodge City, KS
Bid Date: Jan 21 2025
Dodge City, KS
--
Dodge City, KS
--
Dodge City, KS
Bid Date: Dec 02 2021
Dodge City, KS
Bid Date: Sep 02 2021
Dodge City, KS
Bid Date: Feb 28 2019
Dodge City, KS
Bid Date: Mar 08 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.