Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Spokane, Washington. Completed plans call for the renovation of a playground / park / athletic field.
Clarification Deadline 8/26/2024 3:00 PM Contact Information Submit all questions through the 'Clarifications' tab. The City of Spokane Parks & Recreation Department is seeking bids for the Indian Canyon Bunker Renovation Project. This project constitutes a public work under state law. Engineer's Estimate $225,000 + tax The bidder may make written request to the City for withdrawal of a sealed electronic bid prior to the scheduled opening. Unless otherwise specified, no bid may be withdrawn for a minimum of sixty (60) calendar days after the opening date. The bid shall be accompanied by a bid bond bound to the City of Spokane, in an amount of not less than five percent (5%) of the total bid amount. Bid bonds must be by a surety company authorized to do business as a surety in Washington State. As soon as the bid prices have been compared, the City will release the bid security of all except the three (3) lowest responsible bidders. When the construction agreement is signed and returned with executed payment and performance bonds, the other bid security will be released. Award of contract, when made by the City, will be to the lowest responsive responsible bidder. Unsuccessful bidders will not automatically be notified of results. The City is prohibited from executing a contract with a contractor who is not registered or licensed as required by state law. Within ten (10) days of contract award, the Contractor shall sign and return to the City an executed copy of the contract and payment/performance bonds and approved evidence of insurance unless otherwise mutually agreed by the City and Contractor. The bidder agrees to start the work under this contract within ten (10) days of the Notice to Proceed and to substantially complete the specified work by within 54 calendar days or no later than November 22, 2024. In the event the bidder is awarded the contract and fails to complete the work within the time limit or any agreed upon time extensions, liquidated damages shall be paid to the City of Spokane in the amount of THREE HUNDRED-FIFTY DOLLARS ($350.00) per working day until the work is satisfactorily completed. The Contractor shall furnish at its sole cost, a performance bond and a payment bond to the Owner on the form to be provided by the Owner, each equal to one hundred percent (100%) of the contract price. The bonds are to insure faithful and complete performance of the contract and payment of all obligations to laborers and material men arising from the project. The bonds are to be executed by a surety company authorized to do business as a surety in Washington State, and shall remain in effect for one (1) year following the Owner's final acceptance of the Work. Unless approved by the Owner, the surety's name shall appear on the United States Treasury Department's list of authorized sureties - Circular 570 as amended.
Bid Results
Playgrounds / Parks / Athletic Fields
$225,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2024
October 9, 2024
1001 S Assembly St, Spokane, WA
Related To This Project
Spokane, WA
Bid Date: Aug 23 2024
Spokane, WA
Bid Date: Sep 11 2024
Spokane, WA
Bid Date: Sep 30 2024
Spokane, WA
Bid Date: Sep 04 2024
Spokane, WA
Bid Date: Sep 16 2024
Spokane, WA
Bid Date: Sep 16 2024
Spokane, WA
Bid Date: Sep 23 2024
Spokane, WA
Bid Date: Aug 28 2024
Spokane, WA
Bid Date: Sep 09 2024
Spokane, WA
Bid Date: Aug 22 2024
Spokane, WA
Bid Date: Sep 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.