Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 23, 2024 at 8:00 PM
Updated July 1, 2025
Site work for a playground / park / athletic field in La Conner, Washington. Completed plans call for site work for a playground / park / athletic field.
Preschool Playground Remodel - Phase 3 Any questions for the project can be directed to the following person identified above or to Wil James at wiljames@swinomish.nsn.us and must be received no later than 4:00PM on 9/2/2024. 1. Contractor to comply with all normal Swinomish Contract and Division 1 requirements and WSDOT Contract Specifications. 2. The contractor shall execute the Plan set provided by SCJ for all Labor, materials, Inspections and necessary items for the complete Functionality intended of the Preschool Playground Renovation Phase 3 provided in EXHIBIT C 3. The contractor shall work in conjecture with Dustin Deer with Northwest Playgrounds to install the chosen playground features from SCJ 4. The contractor shall work in conjecture with Jeff Hansen with Allplay Systems to install the chosen playground equipment from SCJ 5. The contractor shall construct ADA ramp ending to match 5% slope of ramp and have lateral ADA slope as well for vehicle traffic to the Hats. 6. The contractor shall restore the asphalt walkway in like and kind to original condition or better. Match existing slope and depth 7. From the Building Connect the irrigation line to the water supply and to all piping from phase 1 and test to include phase 3. 8. Contact Swinomish Project Manager a minimum of two days before any/all digging of undisturbed soils on the jobsite. This will enable the owner PM to schedule Tribal Cultural Monitoring for the day. 9. Buy America, Build America apply to this job. 10. Davis-Bacon Prevailing Wage Does apply to this job. 11. INSTALL Necessary footage of SILT FENCE on perimeter of Job site that pass all CESCL requirements 12. Remove access road to the playground once all work is complete 13. Repair all landscape at end of project 14. Due to proximity of child daycare all contractors and subcontractors shall be able to pass a background check upon request.
Award
Playgrounds / Parks / Athletic Fields
$480,921.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2024
October 7, 2024
17275 Reservation Rd, La Conner, WA
Related To This Project
La Conner, WA
Bid Date: Oct 24 2024
La Conner, WA
Bid Date: Dec 05 2024
La Conner, WA
Bid Date: Dec 19 2024
La Conner, WA
--
La Conner, WA
Bid Date: Jan 07 2025
La Conner, WA
Bid Date: Jan 27 2025
La Conner, WA
Bid Date: Feb 18 2025
La Conner, WA
Bid Date: Apr 24 2025
La Conner, WA
--
La Conner, WA
Bid Date: Jun 12 2024
La Conner, WA
--
La Conner, WA
Bid Date: Apr 04 2024
La Conner, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
