Published May 9, 2025 at 8:00 PM
Updated May 10, 2025
Site work for a water / sewer project in Black Hawk, Colorado. Completed plans call for site work for a water / sewer project.
**As of May 09, 2025, this project has has been awarded to Barnard Services, Inc. with the bid amount of $317,209.86.** Reference Number 0000378008 Gilpin County operates a pump station in Dory Lake to augment Ralston Creek flows, when determined by the State Water Commission, out of Dory Lake and into nearby Ralston Creek to maintain obligations to senior water rights. The current system is at risk of failing due to the submerged pumps in Dory Lake nearing the end of their life cycle. Instead of replacing the submerged pumps in-kind, the new construction will include installing a new submerged intake to include an air backwash cleaning system to allow for cleaning without divers. Two new pumps and necessary piping will be installed along the shoreline within a premanufactured pump enclosure. The new intake from the lake will be plumbed into the premanufactured pump enclosure and the outlet will tie into the existing discharge line. Removal and upgrading of electrical fixtures will be required. Firms with experience in pumping facilities for municipal and/or commercial infrastructure will be best suited for this project. A proposal to provide for removing the existing pumping and electrical equipment and installing intakes, piping and premanufactured pump enclosure (already purchased) will be required. Question Deadline 03/12/2025 at 12:00 PM MT Questions are submitted online No, Written Inquiries - Interested applicants may make written inquiries concerning this RFP to obtain clarification of requirements or additional information. No inquiries will be accepted after the date and time of the Written Inquiry Deadline indicated in the Schedule of Activities. Send all inquiries via email, referencing the RFP number and title in the subject line, to rkeenan@gilpincounty.org. Anticipated Notice of Award March 21 2025 Project Start April 14 2025 Gilpin County reserves the right to reject any and all proposals for failure to meet the requirements herein, to waive any technicalities, and to select the proposal which, in the County's sole judgment, best meets the requirements of the project.
Award
Water / Sewer
$317,210.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2025
April 14, 2025
W Dory Way, Black Hawk, CO
Related To This Project
Black Hawk, CO
Bid Date: Sep 17 2024
Black Hawk, CO
Bid Date: Jun 26 2019
Black Hawk, CO
Bid Date: Oct 31 2024
Black Hawk, CO
Bid Date: Feb 14 2025
Black Hawk, CO
Bid Date: Jan 24 2025
Black Hawk, CO
Bid Date: Feb 05 2025
Black Hawk, CO
Bid Date: Feb 14 2025
Black Hawk, CO
Bid Date: Aug 26 2024
Black Hawk, CO
Bid Date: May 29 2024
Black Hawk, CO
Bid Date: Jan 31 2024
Black Hawk, CO
--
Black Hawk, CO
Bid Date: Mar 03 2020
Black Hawk, CO
--
Black Hawk, CO
Bid Date: Jan 09 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.