BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Kingsford, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Kingsford will receive sealed bids for paving approximately 10 alley ways. All work shall conform to Michigan Department of Transportation specifications. The City anticipates that approximately 810 tons of bituminous asphalt paving will be placed along with approximately 6,500 square yards of crush and shaping. The city reserves the right to accept or reject any or all bids in the best interest of the city. The bituminous mixture shall be mixed and placed in accordance with applicable requirements specified for HMA-4EL Bituminous Mixture in Division 5 of the 2020 Michigan Department of Transportation Standard Specifications. Penetration range for regular mixture shall be 58C to -28C. The hot plant mix bituminous aggregate surface course shall conform to the 2020 Michigan Department of Transportation Standard Specifications. The aggregate shall be crushed to the 20-AA Specification for the Mineral Surface. All material produced must be weighed on an approved truck scale and a copy of the truck tickets shall be given to a designated representative of the city of Kingsford. These tickets shall be the basis of payment to the contractor for all material produced, hauled, laid and compacted on areas designated by the city of Kingsford. Contractor shall perform bituminous base course crushing and shaping on designated areas. Bituminous base course crushing and shaping shall be in accordance with Division 3 of the 2020 Michigan Department of Transportation Standard Specifications. Payment for bituminous base course crushing and shaping shall be on the basis of actual measure area crushed, shaped, graded and compacted. Removing and disposing of excess crushed material to meet grade requirements shall be incidental to crushing and shaping. During the grading and shaping process, the contractor shall spread the excess material so that there is an even amount on either side of the alley way. Under no circumstances shall all excess material be graded to only one side. Contractor shall inform the City DPW Superintendent 30 days prior to doing the work in order to allow the city ample time to adjust all manholes, catch basins and valve boxes prior to placement of final paving course. Contractor shall furnish all labor, material, equipment and appurtenance necessary to do the work required. Contractor shall furnish all traffic control devices and supervision of traffic

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
6
Bidding Soon
114
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2024

October 3, 2024

img_map_placeholder

Multiple Locations, Kingsford, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.