EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 12, 2024 at 7:00 PM

Updated November 13, 2024

Site work for a road / highway in Wentzville, Missouri. Completed plans call for site work for a road / highway.

The proposed work includes: The proposed work, hereinafter called the work, includes: traffic signal improvements, including video and advanced detection upgrades, controller replacements, signal cabinets replacements, CCTVs upgrades, and high-resolution data logging configurations for Automated Traffic Signal Performance Measures. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. St. Charles County reserves the right to reject any or all bids. The DBE Goal for this project is 0%. MODOT - Signal Performance Measures Improvements Project Any questions or clarifications concerning this Request for Bid must be submitted in writing to: Donna Clayton St. Charles County Government - Finance Department 201 North Second Street, Suite 541 St. Charles, Missouri 63301 dclayton@sccmo.org For questions or inquiries concerning the specifications please contact: Matt Seggerman St. Charles County Government - Roads & Traffic 201 N. Second St, Suite 560 St. Charles, MO 63301 (636) 949-7500 ext. 3453 Fax: (636) 949-7900 ext. 8950 mseggerman@sccmo.org The bid number and title shall be referenced on all correspondence. All questions must be received no later than 5:00 PM on 9/18/2024. Any question received after this deadline may not be answered

Award

Roads / Highways

$2,036,908.00

Public - County

Site Work

36

8

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
39
Bidding Soon
731
All Active Projects
284
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

October 25, 2024

img_map_placeholder

Multiple Locations, Wentzville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.