BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2024 at 8:00 PM

Updated September 11, 2024

Site work for a bridge / tunnel in McCreary, Manitoba. Completed plans call for site work for a bridge / tunnel.

Shoofly detour construction/removal, demolition of existing bridge, and construction of a three-cell reinforced concrete box culvert over Unnamed Creek on PTH 5, located in the Northwest 1/4 sec. 20-21-15W, Rural Municipality of McCreary, Bridge Site No. 2834-10. Completion Date All remaining Work, including final grading, construction of bituminous pavement, and seeding shall be completed by no later than JUNE 27, 2025. A Performance Bond, conditioned on the due performance of the terms of the Contract for the amount of fifty (50) percent of the Contract Price, shall be furnished by the Contractor. The Performance Bond shall remain in full force and virtue for at least two (2) years after the date on which the final payment is made. Question Acceptance Deadline: 2024/09/06 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Bridges / Tunnels

$500,000.00

Public - State/Provincial

Site Work

19

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
92
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 10, 2024

Project location map

Multiple Locations, McCreary, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.