Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Kearns, Utah. Completed plans call for site work for a water / sewer project.
Prequalifications of General Contractors for KID 2024 Trenchless Sanitary Sewer Rehabilitation Project. Kearns Improvement District (Owner) will accept bids for the construction of the KID 2024 Trenchless Sanitary Sewer Rehabilitation project according to the Drawings and Specifications and in accordance with the Kearns Improvement District Standard Specifications and Drawings Manual, and described in general as: Provide rehabilitation of approximately 2,889 linear feet of 8-inch clay sanitary sewer main utilizing the Curedin-Place (CIPP) method in Kearns, Utah. The work generally includes sanitary sewer pipe rehabilitation using CIPP, including cleaning, CCTV inspection, reinstating approximately forty-five (45) laterals utilizing "top hat" inserts, and related items of work. The OWNER will then make the decision of award and contact the individual bidders with the decision on or after Tuesday, September 17, 2024. CONTRACT DOCUMENTS to be executed by the winning CONTRACTOR will be available after the date of the bid award. These CONTRACT DOCUMENTS will include an agreement to be signed by both the CONTRACTOR and the OWNER prior to any work commencing. A PAYMENT BOND and PERFORMANCE BOND will be required by the winning CONTRACTOR and all necessary forms are also included in the CONTRACT DOCUMENTS. The OWNER reserves the right to reject any or all bids; or to accept or reject the whole or any part of any bid; or to waive any informality or technicality in any bid in the best interest of the District. Only bids giving a firm quotation properly submitted and signed will be accepted. A. A pre-bid conference will not be held for this project. All communication relative to the Project and any questions which BIDDERs may have concerning the project shall be submitted to James Woodruff, jwoodruff@kidwater4ut.gov with the email titled "KID 2024 Trenchless Sanitary Sewer Rehabilitation - Questions". The district will receive and respond to questions with a return email within 3-5 business days, but no later than 3 days before the bids are due. A Bid must be accompanied by Bid security made payable to the OWNER in an amount of five percent (5%) of Bidder's maximum Bid price and in the form of a certified or bank check or a Bid Bond (on the form attached) issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the General Conditions. The number of days within which, or the dates by which, the Work is to be (a) Substantially Completed and (b) also completed and ready for final payment are set forth in the Agreement. Notice of Award Wednesday, September 18, 2024 Notice to Proceed / Commence Construction Tuesday, October 1, 2024 Construction Substantial Completion Project will have 30 days to Substantial Completion from start of project. Must be completed before October 31, 2024. Construction Final Completion 14 Days after the Substantial Completion
Under Construction
Water / Sewer
$184,913.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2024
October 15, 2024
Multiple Locations, Kearns, UT
Related To This Project
Kearns, UT
Bid Date: Oct 01 2024
Kearns, UT
Bid Date: Oct 01 2024
Kearns, UT
Bid Date: Sep 26 2024
Kearns, UT
Bid Date: Jun 06 2024
Kearns, UT
Bid Date: Apr 23 2024
Kearns, UT
Bid Date: Nov 16 2023
Kearns, UT
--
Kearns, UT
Bid Date: Jan 23 2019
Kearns, UT
Bid Date: Feb 12 2019
Kearns, UT
--
Kearns, UT
Bid Date: Dec 16 2021
Kearns, UT
--
Kearns, UT
Bid Date: Feb 07 2023
Kearns, UT
Bid Date: Feb 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.