Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 31, 2025 at 8:00 PM
Updated November 1, 2025
Site work for a municipal facility in Winnipeg, Manitoba. Conceptual plans call for site work for a municipal facility.
Development of a Ceremonial and Cultural Services on 6 acres of land. The Components of the Project on This Site Are as Follows: Support Services Building to Provide the Support Services, the Agency Plans to Establish a Building Consisting of Five Rooms/bedrooms, Each Serving Distinct Functions Such as Administration, One-on-one Support, Emergency Sharing Circles, and Staff Meetings. One (1) of the Rooms/bedrooms Shall Be Used for Administrative (Office) Purposes. Two (2) of the Rooms/bedrooms Shall Be Used to Provide One-on-one Support or Family Traditional Elder Services. One (1) of Rooms/bedrooms is Required for Emergency Sharing Circles, and the Fifth (5) Rooms/bedrooms Shall Be Used as Staff Meeting Space. Currently, the Agency is Considering the Purchase of an Rtm That is About 2,316 Sq. Feet With Five (5) Bedrooms, Two (2) and a Half Bathrooms. A Full Basement is Required Including Storage Shelves to Be Built and Designed 2 (Two) Feet Off the Floor. Ceremonial Area Included in the 6 Acres of Land is Approximately 2 (Two) Acres for a Ceremonial Area for Gatherings, Feast(S) and Conduct Sweat Lodge Ceremonies. This Includes Camping for Approximately 20 Participants in 10 Simple a-frames for an Overnight Stay. The a-frames Perform the Same Function as Tents and So Would Only Include Beds, but No Washroom or Kitchen Facilities. Arbour an Arbour (Fabric Structure) Shall Be Constructed for Cultural Gatherings for Approximately 300 Participants Within the Parameters of the 2 (Two) Acres of Land. TIMELINE: An RFP for Project Management, Design & Engineering services has closed. Award details will not be released for publication. Updates will be made upon issuance of future procurement opportunities for construction, timing is unreleased. Coverage is discontinued at this time.
Conceptual
Municipal
$950,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 19, 2026
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Sep 20 2024
Winnipeg, MB
Bid Date: Oct 07 2024
Winnipeg, MB
Bid Date: Sep 13 2024
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Aug 22 2025
Winnipeg, MB
Bid Date: Sep 09 2024
Winnipeg, MB
Bid Date: Aug 27 2024
Winnipeg, MB
Bid Date: Aug 27 2024
Winnipeg, MB
Bid Date: Sep 17 2024
Winnipeg, MB
Bid Date: Aug 23 2024
Winnipeg, MB
Bid Date: Aug 28 2024
Winnipeg, MB
Bid Date: Sep 12 2024
Winnipeg, MB
Bid Date: Sep 20 2024
Winnipeg, MB
Bid Date: Sep 17 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
