Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 20, 2025 at 8:00 PM
Updated August 23, 2025
Site work and new construction of an educational facility in Winnipeg, Manitoba. Completed plans call for the construction of a 59,698-square-foot educational facility; and for site work for a educational facility.
Desired Outcomes: The federal government is investing millions to support the construction of the PRAIRIE Biologics Accelerator at the University of Manitoba's Fort Garry Campus. This state-of-the-art, facility will bring together scientists and engineers to develop new vaccines and improve biomanufacturing processes. The facility will also include three additional floors for the development of undergraduate student teaching labs. Project Details: - Location: Parking lot A - University of Manitoba Fort Garry Campus - Size: 59,698 sq ft of dedicated lab space plus 3 additional teaching floors for Physiology and Anatomy and Biochemistry. - Key Features: Multiple CL-2 laboratory spaces, teaching labs, offices, prep areas, and washrooms. - Sustainability: Targeting LEED Silver certification at minimum. - Special Requirements: The facility will be connected to the University tunnel system and integration with campus steam and chilled water systems. Building Requirements: - Modern CL-2 laboratory facilities compliant with all safety standards and regulations. - Flexible spaces to accommodate evolving research needs. - Energy-efficient design meeting LEED Silver standards. - Integration with campus utility systems. The anticipated construction budget for the project is $61,000,000 CAD plus applicable taxes. Documents are available at https://umanitoba.bonfirehub.ca/opportunities/95487 Deadline to submit questions, inquiries, and request information (2:00 PM Winnipeg Time) August 11, 2025
Post-Bid
Educational
$61,000,000.00
Public - State/Provincial
LEED Certification, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 22, 2025
October 20, 2025
66 Chancellors Cir, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Sep 09 2024
Winnipeg, MB
Bid Date: Aug 27 2024
Winnipeg, MB
Bid Date: Aug 27 2024
Winnipeg, MB
Bid Date: Sep 27 2024
Winnipeg, MB
Bid Date: Sep 05 2024
Winnipeg, MB
Bid Date: Sep 10 2024
Winnipeg, MB
Bid Date: Sep 09 2024
Winnipeg, MB
Bid Date: Sep 19 2024
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Sep 13 2024
Winnipeg, MB
Bid Date: Oct 07 2024
Winnipeg, MB
Bid Date: Sep 20 2024
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Sep 17 2024
Winnipeg, MB
Bid Date: Aug 23 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
