BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aiea, Hawaii. Completed plans call for site work for a water / sewer project.

Halawa Corporation Yard Fuel Storage Tank Replacement. Projects With a Total Estimated Contract Value of $500,000 or More. The Hawai'i Product Preference Pursuant to Section 103d-1002 of the Hawai'i Revised Statutes and Section 3-124 of the Hawai'i Administrative Rules is Not Applicable to This Solicitation. All Requests Shall Be Received No Later Than the Date Specified in the Solicitation Time Schedule. Requests Received After the Scheduled Time May Not Be Given Consideration. Questions/requests for substitutions due date September 20, 2024 DESCRIPTION OF WORK A. These specifications are divided for convenience into titled divisions and sections as set forth in the TABLE OF CONTENTS preceding these specifications and shall not be considered an accurate or complete segregation of the several units of labor and materials. No responsibility, direct or implied, is assumed by the City and County for omissions or duplications of the subject matter. The Contractor shall be held responsible for the complete work whenever or wherever the parts are described in one or more trade heads. Any mention in these sections or indication on the drawings of articles, materials, operations, or methods required that the Contractor furnish each item so mentioned or indicated, of the kind, type, or design and quality of each item so mentioned or indicated on the drawings, and that the Contractor furnish all labor, materials, equipment, incidentals, and supervision necessary to complete the work in accordance with the drawings and the true meaning and intent of these specifications, even though such mention of articles, materials, operations, methods, quality, qualifications, or conditions is not expressed in complete sentences. B. Where devices or items or parts thereof are referred to in the singular, it is intended that such references shall apply to as many such devices, items, or parts as are required to properly complete the work. C. Schedule of work included in these specifications sections are given for convenience and shall not be considered as a comprehensive list of items necessary to complete the work of any section. D. The Contractor shall employ the usual standard practice of coordinating the work covered in each section with the work of other sections. The necessary information and the items, accessories, anchors, connections, patterns, templates, etc., shall be delivered when required, in order to prevent any delay in the progress and completion of the work.

Bid Results

Water / Sewer

$994,000.00

Public - County

Site Work

18

15

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
97
All Active Projects
46
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 11, 2024

img_map_placeholder

99-1077 Iwaena St, Aiea, HI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.