BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Winnipeg, Manitoba. Design plans call for the construction of a educational facility; for site work for a educational facility; and 21,000-square-foot educational facility.

Construction of the PRAIRIE Biologics Accelerator at the University of Manitoba's Fort Garry Campus. This state- of-the-art, 21,000 square foot research facility will bring together scientists and engineers to develop new vaccines and improve biomanufacturing processes. Location: The exact site is yet to be finalized, with options including parking lots A and K, and green space east of Parker Building. Size: 21,000 sq ft of dedicated lab space plus 3 additional floors of shell space for future expansion. Key Features: Multiple BSL-2 laboratory spaces, offices, prep areas, and washrooms. Sustainability: Targeting LEED Silver certification at minimum. Special Requirements: Tunnel or overhead connection to the nearest building and integration with campus steam and chilled water systems. Building Requirements Modern BSL-2 laboratory facilities compliant with all safety standards and regulations. - Flexible spaces to accommodate evolving research needs. - Energy-efficient design meeting LEED Silver standards. - Integration with campus utility systems. TIMELINE: An RFP for design has been awarded. Design is underway. Updates may be available late spring 2025 The estimated construction budget is $32,000,000.00.

Design

Educational

$32,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
7
Bidding Soon
212
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

img_map_placeholder

66 Chancellors Cir, Winnipeg, MB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.