BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Benton Harbor, Michigan. Completed plans call for the construction of a educational facility; for site work for a educational facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project includes but is not limited to: Site preparations in advance of the Nifty Hoops hoophouse erection. Extension of water and electrical utilities. New crushed stone drive and walkways. Purchase and placement of a new tool shed. Coordination with Nifty Hoops, contact: Jessica Alexa Nifty Hoops 734-845-0079 The Owner reserves the right to reject any and all submissions without explanation, either in whole or in part; to waive informalities and/or to negotiate separately in any matter whenever it is deemed in the sole opinion of the Owner to be in its best interest. It is the intention of the Owner that the construction of this project will start no later than seven (7) working days following award of Contract or Letter of Intent to award contract. Selection Criteria for this project will be based on the lowest base bid. Question Deadline 09/07/2024 Direct questions to the LMC Purchasing & Risk Manager, Nathan Main, via email at nmain@lakemichigancollege.edu. Addenda may be issued during the bidding period. All Addenda become part of the Contract Documents. Include resultant costs in the Bid Amount. Verbal answers are not binding on any party. Clarifications requested by bidders must be in writing not less than 3 days before date set for receipt of bids. The reply will be in the form of an Addendum, a copy of which will be forwarded to known recipients. Before the start of construction, a pre-construction meeting shall be held. It shall be the Contractor's responsibility to arrange said meeting as soon as notification of award has been made by the College, Coordinate location of the meeting with the LMC Project Manager. Once the work is started, it shall proceed to completion without delay. Projected Award Date: September 11, 2024 Projected Start Date Immediately following award Substantial Completion 9/27/24

Under Construction

Educational

$47,400.00

Public - State/Provincial

New Construction, Paving, Site Work

3

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
67
Bidding Soon
1,503
All Active Projects
651
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

September 20, 2024

img_map_placeholder

2755 E Napier Ave, Benton Harbor, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.