BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Santa Ana, California. Completed plans call for the renovation of a educational facility.

Fire Systems and Code Repairs at Santa Ana College The estimated construction cost has a range of $500,000.00 - $550,000.00 Bid Security. Each Bid Proposal shall be accompanied by Bid Security in an amount equal to Ten Percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). Failure of any Bid Proposal to be accompanied by Bid Security in the form and in the amount required shall render such Bid Proposal to be non-responsive and rejected by the District. Labor & Materials Payment Bond; Performance Bond. Prior to commencement of the Work, the Bidder awarded the Contract shall deliver to the District two (2) each of Labor & Material Payment Bond and a Performance Bond issued by a California Admitted Surety in the form and content included in the Contract Documents each of which shall be in a penal sum equal to One Hundred Percent (100%) of the Contract Price. No Withdrawal of Bid Proposals. Bid Proposals shall not be withdrawn by any Bidder for a period of 90 calendar days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals. Award of Contract. The Contract for the Work, if awarded, will be by action of the District's Board of Trustees to the responsible Bidder submitting the lowest priced responsive Bid Proposal. If the Bid Proposal requires Bidders to propose prices for Alternate Bid Items, the District's selection of Alternate Bid Items, if any, for determination of the lowest priced Bid Proposal and for inclusion in the scope of the Contract to be awarded shall be in accordance with the Instructions to Bidders. The District reserves the right to waive immaterial irregularities or informalities in any Bid Proposal or in the bidding process. Additionally, the District reserves the right to reject all Bid Proposals. The lowest responsive bid for the Work shall be determined as follows: Base Bid Amount. All Bidder questions about the meaning or intent of the Contract Documents shall be directed to the District in writing by email to facilitiesbid@rsccd.edu ("Pre-Bid Questions") by utilizing the District's Pre-Bid Clarification Form provided within. Pre-Bid Questions and requests for clarifications must be submitted to the District by 5:00 P.M. August 21, 2024 . Rejection of Bids. The District reserves the right to reject any or all bids, including without limitation, the right to reject any or all nonconforming, non-responsive, unbalanced, or conditional Bids, to re-bid, and to reject the Bid of any Bidder if the District believes that it would not be in the best interest of the District to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the District. The District also reserves the right to waive inconsequential deviations not involving price, time, or changes in the Work. For purposes of this paragraph, an "unbalanced bid" is one having nominal prices for work item(s) that represent substantive work and/or overly-enhanced prices for nominal work item(s). Contract Time. The Contract Time is 332 calendar days from date of Notice to Proceed to Final Completion. Failure to achieve the Contract Time will result in the assessment of Liquidated Damages as set forth in the Contract. Notice to Proceed. The District may issue a Notice to Proceed within 90 calendar days from the date of the Notice of Award. Upon receipt of the Notice to Proceed, the Contractor shall complete the Work within the period indicated in the Contract Documents. It is further expressly understood by Contractor that Contractor shall not be entitled to any claim of additional compensation or additional time when the Notice to Proceed is issued within the 90 calendar days. Pre-Bid Questions and requests for clarifications must be submitted to the District by 5:00 P.M. August 21, 2024 . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Educational

$600,000.00

Public - County

Renovation

135

9

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
549
Active Projects
257
Bidding Soon
4,035
All Active Projects
1,850
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 4, 2024

October 4, 2024

September 1, 2025

img_map_placeholder

1530 W 17th St, Santa Ana, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.