BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in North Quincy, Massachusetts. Working plans call for the construction of a 11,750-square-foot educational facility; and for site work for a educational facility.

The owner has determined a prequalified list of design build companies. Project is not awarded. Question Deadline 09/18/2024 at 5:00 PM ET Requests for clarification must be received PCA360 and will respond to any and all written requests for clarification and shall e-mail responses to all registered contractors by September 20, 2024, no later than 5:00 P.M. Temporary modular classroom building for the Squantum School to be located at the existing school at 50 Huckins Ave., Quincy, MA. The modulars are needed in connection with the construction of a new School Building that will begin in June 2025 and be completed in November 2027. The City of Quincy, the Awarding Authority, invites competitive sealed proposals per M.G.L. c. 149, 44E, for the design, installation and two-year lease of one modular classroom building consisting of nine classrooms, handicap accessible student gang restrooms, two faculty restrooms that meet code requirements, one custodial utility closet, one staff office, approximately 11,750 sq. ft. Proposer must be certified by DCAMM for Modular Construction. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The City of Quincy, the Awarding Authority, invites competitive sealed proposals for the design, installation and two-year lease of one (1) modular classroom building consisting of nine (9) classrooms atthe Squantum School, 50 Huckins Ave, Quincy, MA 02171. All classrooms shall be compliant with all federal, state, and local laws, rules, and regulations. Modular building shall include the following: handicap accessible student gang restrooms, two (2) faculty restrooms that meet code requirements, one (1) custodial utility closet, (1) staff office, a three (3) phase electrical system, fire protection system (sprinklers) and a tech ready system. Fire alarm system will be by others. The total building shall be as close to 11,750 square feet as possible.

Final Planning

Educational

$4,200,000.00

Public - City

New Construction, Site Work

4

8

6

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
354
Active Projects
205
Bidding Soon
2,622
All Active Projects
1,265
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2024

January 20, 2025

img_map_placeholder

50 Huckins Ave, North Quincy, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.