BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Chicago, Illinois. Completed plans call for the renovation of a municipal facility.

HVAC Improvements at Various Locations Estimated Cost Group A: $18,443,000.00 Bid Deposit Group A: $737,000.00 Estimated Cost Group B: $701,325.00 Bid Deposit Group B: $28,000.00 Total Estimated Cost: $19,144,325.00 Total Bid Deposit $765,000.00 Any questions regarding the downloading of the Contract Document should be directed to the following email: contractdesk@mwrd.org or call 312 751 6643. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et.seq.), where it is stated in the Invitation to Bid Page. The Metropolitan Water Reclamation District of Greater Chicago reserves the right to reject any or all Proposals if deemed in the public's best interest. Metropolitan Water Reclamation District of Greater Chicago DESCRIPTION OF WORK The work to be performed under Groups A and B in this Contract consists of providing all labor, materials, tools, supplies, supervision, scaffolding, transportation, equipment, and all appurtenances required for the following work and all work as shown on the Plans and specified herein: Group A Remove and replace air handling units, cooling towers, steam heat exchangers, pumps, electrical equipment, supply and exhaust ductwork, mechanical and plumbing piping, electrical conduits, pneumatic controls, grilles, registers, diffusers, VAV boxes, reheat coils, etc., and all associated hangers and supports at the Engineering Center, M&R Building, and OSS Building. Furnish and install new chiller at the OSS Building. Install new plus modify existing building control system at Engineering Center, M&R Building, and OSS Building. Group B Install new gas meter and startup existing hot water boiler and radiant floor heating system in the Heavy Equipment Building plus install new underground gas line and new HVAC heating system in the Building 25 at the Calumet WRP. In addition, upgrade controls at existing steam boilers and modify steam piping at the 95 th Pump Station.

Sub-Bidding

Municipal

$19,144,325.00

Public - County

Renovation

1

15

51

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
123
Bidding Soon
1,807
All Active Projects
806
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.