BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Parkin, Arkansas. Completed plans call for the renovation of a residential development.

Painting and Flooring Superintendents Residence 1. Prospective contractor shall remove carpet, padding, tack strips in rooms identified on the added floor plan attachment. 2. Prospective contractor shall prep existing floors where carpet was removed and repairing any cracks or imperfection in the concrete and applying a self-leveling bonding agent if required. 3. Prospective contractor shall do the removal of all debris from project to dispose offsite. 4. Prospective contractor shall remove and reinstall existing door units and all trim to a height that allows the doors to clear the new flooring installed if applicable. 5. Prospective contractor Shall Construct all construction safety barriers to keep bystanders out of work areas and at a safe distance for the duration of the project. 6. Prospective contractor shall furnish all tools, materials, equipment, and labor necessary to install (Approx. 1'673 sq. ft.) of LVT flooring. 7. Prospective contractor shall be responsible for grinding, scraping off all mortar, grout and glue, and tack strips to allow for a smooth transition for new LVT. 8. The new flooring shall be Lifeproof 100% waterproof Luxury vinyl plank flooring with ridge core, 8.7" width by 48" length. Click lock, 22 mil wear layer equivalent or better. 9. The flooring shall have a 20-year Commercial warranty and Lifetime residential warranty equivalent or better with no transitions from room to room. 10. Prospective contractor shall replace any bad base board and add any that might be necessary and paint to best match existing with two coats of BEHR Marquee or equivalent. 11. If base doesn't have to be removed then a base shoe, quarter round (Approx. 510' lin. Ft.) painted to match base. Or to match flooring being installed in the residence. 12. The floor color shall be sterling oak or equivalent. 13. Prospective contractor shall be responsible for moving any furniture necessary to install flooring. And the removal and re-installing of toilets with new seals. 14. Prospective contractor shall be responsible for adhering to paint manufactures guidelines, labeling this includes applying during appropriate temperatures and humidity levels. 15. Prospective contractor shall be responsible for preparing all surfaces for painting including making sure all wood and other surfaces that's being painted is washed clean and dry and properly prepped with all lose paint removed and nail holes cracks properly filled. 16. Prospective contractor shall remove any wallpaper (Approx. 1'456 sq. ft.) in rooms that are being painted. 17. Prospective contractor shall clean prep all the walls and paint interior walls per-attached floor plan (Approx. 7'197 sq. ft.) The trim and doors are included in wall footages. 18. Prospective contractor shall clean and prep the ceilings to be painted per-attached floor plan (Approx. 325 sq. ft.) with BEHR Ulta white ceiling flat interior or equivalent. 19. Prospective contractor shall paint ceilings (flat ceiling white) doors and trim ( semi-gloss pure white) and walls (semi-gloss off white). 20. Prospective contractor shall be responsible for moving any furnishings and appliances that is in the way of painting. 21. Prospective contractor shall be responsible for providing any necessary covering and protection of any areas that are to be painted over or around to prevent any drips or over spray or any other flying debris or by-product from work being performed. 22. Prospective contractor shall take precautions to Prevent unnecessary damage to any part of bldg.. 23. Prospective contractor shall be responsible for all post-project clean-up and the remove all debris (including nails and metals, all disposable materials offsite) at the end of each workday. 24. Prospective contractor shall work during normal park business hours. 25. Must provide one (1) year warranty that applies to all work performed. 26. Prospective contractor to furnish Workmen's Comp., General Liability Insurances. 27. Prospective contractor shall be responsible for all materials deliveries and protection of during construction. 28. Prospective contractor shall work with Park officials for best time for work to be completed. 29. All Work to be done with in (30 days) from time of bid being awarded. 30. Contact Greg Hart 501.554.9704 once project is complete so final inspection can be completed. Address: 404 Park Street Parkin Ar, 72373 This Quote Bid is issued by the Department of Parks Heritage and Tourism for the Parks Operations division to obtain pricing and a contract for a Major Maintenance project. Direct all communications regarding this Solicitation to the Buyer on page one (1) of the Quote Bid. Any contract awarded as a result of this solicitation that exceeds $50,000.00 in value is subject to the Performance and Payment Bond requirements of Ark. Code Ann. 18-44-501et seq., 19-4-1401et seq., and 22-9-401et seq. The Surety guarantees that the Principal shall comply with Ark. Code Ann. 22-9-301 et seq. by payment and full compliance with all prevailing hourly wage contract provisions. The bond must be filed in the county where the work is to be performed A women-owned business is defined by Act 1080 of the 91st General Assembly Regular Session 2017 as a business that is at least fifty-one percent (51%) owned by one (1) or more women who are lawful permanent residents of this State. The State's right to inspection may be exercised at any reasonable place and time and in any reasonable manner, as determined in the State's reasonable discretion, prior to acceptance of and payment for any commodities procured under a resulting contract.

Bid Results

Residential Subdivision

$27,900.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
26
Bidding Soon
370
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

October 14, 2024

img_map_placeholder

404 Park St, Parkin, AR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.