BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7" AND 8" CONCRETE PAVEMENTS, CONCRETE TRAFFIC ISLAND, VARIABLE THICKNESS CONCRETE BASE, 6" CONCRETE BASE, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5" CONCRETE WALKS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, SIGNAGE AND SIGNAGE INSTALLATION, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, ETC.; ST211230141 - East North Avenue - North Bremen Street to North Booth Street (Concrete Speed Table) ST211230149 - Intersection of North Maryland Avenue @ East Linnwood Avenue (Traffic Circle) ST211240114 - Intersection of South 38th Street @ West Scott Street (Traffic Circle) ST211230123 - West Pierce Street - West Reynolds Place to South Layton Boulevard (Raised Crosswalks) Time for Completion: All work on this contract shall be completed by November 30, 2024. The work on this contract shall start on or before September 15, 2024 (Raised Crosswalks) Time for Completion: All work on this contract shall be completed by November 30, 2024. The work on this contract shall start on or before September 15, 2024 The SMWBE/LSA requirement for this project is 25% of the contract base bid. The SMWBE/LSA Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SMWBE certificates must be submitted with the Form A. Incomplete SMWBE/LSA Compliance Plans (Form A) or inaccurate Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov Please contact the Office of Equity and Inclusion (OEI) at 414-286-5553 should you have any questions or concerns regarding the training or reporting process. The bidder's commitment for SMWBE participation on this project is 25 %

Award

Roads / Highways

$185,041.00

Public - City

Paving, Site Work

4

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
50
Bidding Soon
1,054
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2024

September 15, 2024

img_map_placeholder

Multiple Locations, Milwaukee, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.