BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2024 at 8:00 PM

Updated October 3, 2024

Site work for a pre-engineered storage facility in Stanley, Wisconsin. Completed plans call for site work for a pre-engineered storage facility.

The Chippewa County Department of Land Conservation and Forest Management (LCFM) is seeking bids for three (3) state cost-shared projects. The Ryan Westaby Earthen Waste Storage Facility Closure project (Stanley, WI) includes earthwork, pipe, and hopper decommission, and site restoration. The Joseph Tiry Earthen Waste Storage Facility Closure project (Stanley, WI) includes earthwork, pipe decommission, and site restoration. The Darrell Schneider Barnyard and Walkway project (Boyd, WI) includes earthwork, concrete work, and site restoration. These projects will be bid separately.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$15,119.00

Public - County

Site Work

5

3

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
51
Bidding Soon
410
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2024

September 23, 2024

Project location map

9348 350th St, Stanley, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.