BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Isle of Palms, South Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Isle of Palms is seeking bids from qualified general contractors for the construction of a 662' by 6' and 450' by 6' beach access boardwalks. A site visit to the Isle of Palms 26A and 36A beach access is recommended prior to submitting a bid. Question Deadline 09/13/2024 at 5:00 PM ET Bidders should send questions regarding this Request for Bids to Matt Simms, Zoning Administrator, in writing or email to msimms@iop.net. Questions received before this deadline will be answered via addendum posted on the City's website at electronically. A performance bond for 100% of the construction contract amount will be required. All work for additions shall be substantially completed (as evidenced by the date on the CERTIFICATE OF SUBSTANTIAL COMPLETION) within: ONE-HUNDRED TWENTY (120) calendar days from the date set forth in the NOTICE TO PROCEED, subject to adjustments as provided in the Contract Documents. Final completion of all work shall be performed within: THIRTY (30) calendar days from the scheduled contract time for substantial completion, subject to adjustments as provided in the Contract Documents. The undersigned further agrees that from the compensation to be paid, the owner may retain as liquidated damages the sum of one thousand dollars ($1,000) for each calendar day the actual contract time for Substantial Completion for the project exceeds the specified or adjusted contract time for Substantial Completion as provided in the Contract Documents. The City reserves the right to reject any and all bids and to waive irregularities. The Scope of work for the 26A beach access boardwalk includes, but is not limited to the following: 1. Regrade and compact surfaces to allow new improvements to match the elevations, as detailed on the attached plans, dated 07/31/2024 by Jody Furman. 2. Construction of a wooden boardwalk, including Ipe decking, measuring 662' by 6', including steps as detailed in the attached plans 3. Shift all existing signage to not conflict with the new improvements. The Scope of work for the 36A beach access boardwalk includes, but is not limited to the following: 1. Regrade and compact surfaces to allow new improvements to match the elevations, as detailed on the attached plans, dated 05/13/2024 by Jody Furman. 2. Construction of a wooden boardwalk, including Ipe decking, measuring 450' by 6' 3. Shift all existing signage to not conflict with the new improvements.

Award

Sidewalks / Parking Lot

$261,337.00

Public - City

Paving, Site Work

6

5

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
45
Bidding Soon
441
All Active Projects
213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2024

October 28, 2024

img_map_placeholder

Multiple Locations, Isle of Palms, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.