BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Barnstable, Massachusetts. Working plans call for site work for a water / sewer project.

The Procurement Office on behalf of the Department of Public Works is requesting bids for the following: FY25 ROAD DRAINAGE IMPROVEMENTS. The work to be performed under this contract includes, but is not limited to, unclassified excavation, removal, disposal, and replacement of the existing storm drainage system, pavement repair, and reconstruction, loaming and seeding, and other incidental work Contractor Prequalification by the Massachusetts Department of Transportation (MassDOT) in accordance with the Shared Streets and Spaces Program and MGL Ch 90, S34, 720 CMR 5.00 MassDOT prequalification of contractors with class of work as Drainage for the project with an estimated value of $1,957,926.00 is required. Only Prequalified or officially waived Contractors may submit bids. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Contractor Prequalification by MASSDOT for Drainage is required. Questions Due Date: Sep 18th 2024, 12:00 PM EDT NO LATER THAN NOON Minority Business Enterprise (MBE) and Women's Business Enterprise (WBE) policies of the Town of Barnstable are applicable. The "Fair Share" construction requirement for this project is a minimum of 10.4% combined MBE/WBE participation by state certified MBEs and WBEs. Within five days after the Bid Opening, the Bidder shall submit a "Schedule for Participation by Minority Business Enterprises" with accompanying Letters of Intent by each minority subcontractor proposed to be used by the Bidder. See Town Policy and Section 6 of this document for details of required submittals. The completion date for all of the work to be performed under this contract is within 270 days of executed contract date. Construction may begin following the receipt of notice to proceed and approval of all required Contractor submittals.

Final Planning

Water / Sewer

$1,957,926.00

Public - City

Site Work

33

5

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
104
Bidding Soon
1,968
All Active Projects
824
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

November 25, 2024

img_map_placeholder

Multiple Locations, Barnstable, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.