BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated October 23, 2025

Renovation of a municipal facility in Fall River, Massachusetts. Completed plans call for the renovation of a municipal facility.

**As of October 23, 2024 bids for this project has been rejected. Project will be redesigned and bid (estimate December 2024). Fall River DCM Facility Improvements Project - Phase III Bids From Contractors for the Fall River Dcm Facility Improvements - Phase Iii at Fall River Dcm Facility in Fall River, Massachusetts, in Accordance With the Documents Prepared by Tighe & Bond. the Project Consists of but Not Limited to: Repairs to the Structural Elements, Building Envelope, Mechanical, Fire Protection, Fire Alarm, Electrical, and Plumbing Systems of the Former Incinerator Building. Removal and Replacement of Existing Roofing System, Doors, and Windows. Abatement of Hazardous Materials Including Asbestos, Lead Paint, and Assumed Pcb Bulk Product Waste . The Work includes the following major items: repairs to the structural elements, envelope, and mechanical, electrical, and plumbing systems of the DCM former incinerator building. General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, General Building Construction, and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime/General Contractor Update Statement. Filed sub-bidders must be DCAMM certified for the trades listed below and bidders must include a current DCAMM Sub-Bidder Certificate of Eligibility and a signed DCAMM Sub-Bidder's Update Statement. TRADES Miscellaneous and Ornamental Metals Waterproofing / Dampproofing / Caulking Roofing and Flashing Metal Windows Painting Fire Protection Sprinkler Systems Plumbing Heating / Ventilating / Air-Conditioning (HVAC) Electrical Work General bids and sub-bids shall be accompanied. The hard copy Contract Documents may be seen at: Nashoba Blue Inc. 433 Main Street Hudson, MA 01749 978-568-1167 The work is estimated to cost $8,000,000.00. Design Participation: Combined MBE/WBE goal of ( 21.6%) Construction Participation: Combined MBE/WBE goal of ( 13.0%) The project must be substantially complete on or before November 3, 2025 and reach final completion by December 1, 2025.

Award

Municipal

$7,888,888.00

Public - City

Renovation

127

28

2

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
507
Active Projects
135
Bidding Soon
3,708
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

May 12, 2025

Project location map

10 Lewiston St, Fall River, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.