BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Saint George Island, Alaska. Completed plans call for site work for a water / sewer project.

The Engineer's Estimate is between $1,000,000 and $2,500,000 Saint George Water Storage Tank Replacement. The contractor shall construct a new insulated water storage tank (WST) and make improvements to the existing infrastructure including: o the demolition and disposal of an existing 286,000-gallon bolted-and-gasketed steel WST, o install and connect a temporary 20,000-gallon bladder tank to provide for continued water system service to the community during construction, o renovation and upgrades to the metering building, and o demolition and replacement of the existing well site electrical control conex. Work shall be completed in accordance with the attached design, specifications, and conditional approval to construct. The new water tank will be built on the existing tank pad and shall be an insulated 141,000-gallon bolted steel WST. Important Notice: if You Receive This Solicitation From the State's Online Public Notice Website You Must Register With the Procurement Officer to Receive Subsequent Amendments. Registration Must Be in Writing and May Be Made via Email to Evan.patterson@alaska.gov. Failure to Register With the Procurement Officer May Result in Rejection of Your Offer. Ada: the State of Alaska Complies With Title Ii of the Americans With Disabilities Act of 1990. Individuals With Disabilities Who May Need Auxiliary Aids, Services, and/or Special Modifications to Submit a Proposal Should Contact the Procurement Officer via the Below Contact Information No Later Than 10 Calendar Days Prior to the Proposal Closing Date to Make Necessary Arrangements. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All work shall be completed by: Substantial completion: 7/31/2025 Final completion: 8/31/2025

Award

Water / Sewer

$2,818,733.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

November 25, 2024

img_map_placeholder

To Be Determined, Saint George Island, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.