Renovation of a municipal facility in Stillwater, Minnesota. Completed plans call for the renovation of a municipal facility.
Remove and replace asphalt shingles Certified Checks shall not be acceptable in lieu of a Bid Bond Base Bid #1 - The Owner (City of Stillwater) is requesting the Public Works Reroof Project to be base bid as a complete removal and replacement of the existing asphalt shingle roofing and underlayment on both the main building and the adjacent salt storage building. Alternate No. 1 - Installation of additional polyiso insultation required to meet current energy code on both the main building and the adjacent salt storage building. See detail 3 / a2.1 for typical scope. (make sure to be aware of metal siding modifications) Alternate No. 2: Replace all existing low slope and flat roofing membranes with new fabric-reinforced roofing system (Basis of Design: Conklin). Include 2.5" of new polyiso insulation beneath new roofing system to meet current Energy Code requirements. See detail 4 / a2.1 for typical alternate scope. Including raising of current mechanical equipment to modify or replace curbing to meet code Alternate No. 3: See detail 2 / a5.2 for alternate scope. Alternate No. 4: Provide vertical prefinished metal panel assembly and prefinished metal coping cap to extend from face of new panel assembly to existing panel assembly. See sheet 2.2 for alternate scope. Alternate No. 5: Replace all existing gutter and downspout assemblies with new prefinished aluminum gutter and downspout assemblies. Add new locations of assemblies as indicated on plans. See detail 3 / a5.2 for alternate scope. Alternate No. 6: Remove existing translucent skylight assembly in its entirety down to roof deck, prep for new roof infill or new translucent skylight. Basis of Design: Kalwall, Product S-lines, Finish: Translucent, Crystal. Description of Work The work called for in the contract documents, including both the written specification and any detailed drawings, shall include the furnishing and installation of all roofing materials, insulation, fasteners, metal work, and other materials deemed to be a part of the overall system as specified in the Contract Documents.
Post-Bid
Municipal
$515,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2025
March 12, 2025
3325 Boutwell Rd N, Stillwater, MN
Related To This Project
Stillwater, MN
--
Stillwater, MN
Bid Date: Oct 08 2024
Stillwater, MN
Bid Date: Apr 16 2019
Stillwater, MN
Bid Date: Dec 05 2024
Stillwater, MN
Bid Date: Dec 19 2024
Stillwater, MN
--
Stillwater, MN
Bid Date: Aug 27 2024
Stillwater, MN
--
Stillwater, MN
Bid Date: Sep 04 2024
Stillwater, MN
Bid Date: Aug 28 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.