BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Grant, Alabama. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The bracket estimate on this project is from 600,000 to 800,000 this bracket range is provided only as a General indication of a broad financial size category for the project. It should not be used in Preparing a bid, nor will it have any bearing on any decision to award the contract. The principal Items of work are approximately as follows Sidewalk extensions along main street from peck sutton road to 6th street including 936 sy removing Curb and gutter, 745 tons crushed aggregate, section 825, 235 tons superpave bituminous concrete Wearing surface layer, patching, 10 lf 12" trench drain, mobilization, 1,686 sy concrete sidewalk, 4" Thick, 1,551 sy concrete driveway, 6" thick, 128 sf detectable warning surface, 278 sy concrete curb Ramp, 244 lf concrete gutter, 44 lf concrete gutter (valley), 424 concrete curb, type a, 73 lf concrete Curb type e (modified), 659 lf combination curg and gutter, type c, 166 cy topsoil, 206 sy solid sodding (bermuda), erosion and sedimentation control items, ,2,000 lf construction safety fence, geometric Controls, 1,169 sf traffic control markings and legends, clss 2, type a, 58 lf roadway sign post, traffic Control items and related items A cashier's check or bid bond for 5% of the amount bid (maximum of $10,000.00) and made payable to the town of grant must accompany each bid as evidence of good faith. It is not required that a contractor be licensed in order to submit a bid; however, prior to award of a Contract, proper proof of all applicable licensures must be provided by the contractor. Proof Of insurance coverages of the types and amounts as set forth in the project specifications will be Required of the contractor, and any and all subcontractors, prior to beginning work. The Contractor will be required to perform work amounting to at least 30% of the total contract cost With his own organization. The entire project shall be completed in ninety (90) working days Transportation issued pursuant to such act, all bidders are hereby notified that it will be Affirmatively ensured that in any contract entered into pursuant to this advertisement, minority Business enterprises will be afforded full opportunity to submit bids in response to this invitation And will not be discriminated against on the grounds of race, color, religion, sex, or national origin In consideration for an award The right to reject any or all bids and to disregard any minor irregularities is reserved by the Owner.

Bid Results

Sidewalks / Parking Lot

$458,109.00

Public - City

Paving, Site Work

68

9

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
45
Bidding Soon
593
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

November 4, 2024

img_map_placeholder

Main St, Grant, AL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.