BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Anchorage, Alaska. Completed plans call for site work for a water / sewer project.

Project Consists of demolishing the existing structure completely. Construct a new warm storage building. ESTIMATED CONSTRUCTION COST: Between: $500,001 - $1,000,000 The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. No bidder may withdraw his bid after the hour set for the opening of bids or before the award of contract unless said award is delayed for a period exceeding sixty (60) days from the time of the opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/17/2024 at 12:00 PM AKT All Questions Shall Be Submitted Prior to the Question Due Date This Will Be The Final Opportunity to Ask Questions or Request Clarifications. GENERAL STATEMENT AND EXTENT OF WORK All proposed Work for the Credit Union Drive Sewer Rehabilitation Project is located in Anchorage, Alaska, as shown on the Drawings. The Work included in this Contract consists of furnishing all labor, equipment, materials, supervision, and other facilities necessary to complete the Work set forth in the Plans, and Specifications, and terms of the Contract successfully. The Work that is presented in the Bid Proposal for this Contract consists of the Contractor to furnish and install approximately 658 linear feet of 8-inch PVC, C900 sewer main, 92 linear feet of 6-inch PVC, C900 sewer service connection, abandon in place by grouting 330 linear feet of existing 8" DI sewer main, remove and dispose of 453 linear feet of existing 8" DI sewer main, remove and dispose 6 existing SSMH's, construct 7 new Type A, SSMH's. Additionally, the Work includes but is not limited to trench dewatering, a temporary sewer bypass system, topsoil and seeding, and the restoration of all affected streets. It shall be the responsibility of the bidder to prepare the bid so that all materials and working arrangements harmoniously conform to the intent of the Contract Specifications and Special Provisions.

Bid Results

Water / Sewer

$1,776,077.00

Public - City

Site Work

12

12

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
128
All Active Projects
44
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

November 11, 2024

img_map_placeholder

Credit Union Dr, Anchorage, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.