BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Kearney, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Each bidder will be required to submit with his proposal, a certified check, a cashier's check or bid bond made payable, without condition, to the City Clerk, Kearney, Nebraska, in an amount equal to five percent (5%) of the proposal. The successful bidder will be required to give a payment bond, and performance bond, each, in the amount of one hundred percent (100%) of the contract price. No bid submitted by any contractor which contains a condition or qualification shall be recognized or accepted by the City Council, and any letter or communication accompanying the bid which contains a condition or qualification upon the bid which has the effect of qualifying or modifying any provision of the specifications in any manner, shall be construed as a qualifying bid and may be rejected by the City Council as not responsible. The City of Kearney reserves the right to reject any or all proposals and to waive any informalities or irregularities in the bids received, and to accept any proposal which is deemed most favorable to the City of Kearney. Furnish all labor, materials, and equipment required for erecting, maintaining and removing temporary and permanent erosion and sedimentation controls as shown on the drawings and as specified herein. Permanent erosion and sediment controls include, but are not limited to, sodding, seeding, mulching, watering, and reseeding of all disturbed surfaces, including waste, stockpile, borrow, staging, and storage area surfaces. Work shall be scheduled to minimize erosion. Interceptors shall be provided at locations that will ensure that erosion during construction will be either eliminated or maintained within acceptable limits. Temporary sedimentation controls include, but are not limited to; silt dams, traps, barriers, diversion structures and appurtenances at the foot of sloped surfaces which will ensure that sedimentation pollution will be either eliminated or maintained within acceptable limits.

Award

Roads / Highways

$490,280.00

Public - City

Paving, Site Work

23

8

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
14
Bidding Soon
126
All Active Projects
55
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

December 16, 2024

img_map_placeholder

Multiple Locations, Kearney, NE


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.