Site work and new construction of a medical facility in Columbia, Missouri. Completed plans call for the construction of a 27,885-square-foot medical facility; and for site work for a medical facility.

This project will fit out approx. 27,885 sf of shell space that will encompass five (5) general surgery operating rooms, two (2) interoperative iMRI operating rooms, fourteen (14) pre-postoperative rooms and seven (7) PACU bays along with supporting services areas. Anticipated GMP: $15,150,000 On-Site Construction Start Fall 2025 Substantial Complete/Commissioning May 2027 Construction Complete June 2027 The construction manager at risk will be selected using a two-step process. Step One - Request for Qualifications (RFQ) shall consist of the review and ranking of each respective firm's qualifications and responses to the university's selection criteria as stated herein. This is a competitive process with points awarded for each category of the selection criteria. The university will utilize a review panel to evaluate the offerings and establish a preliminary ranking of the firms. Five or fewer firms with the highest preliminary ranking based on the firm's responses to the selection criteria will be interviewed by the owner's panel. At a minimum, the proposed project director/executive, senior project manager(s), scheduling manager(s), assisting project manager(s) and superintendent(s) shall attend the interview. The interview will include introductions with each proposed staff member summarizing their responsibilities and experience, followed by a question-and-answer session conducted by the Owner. The questions will not be provided prior to the interview. The respondent will be allowed fifteen minutes to present information supporting their response to this RFQ, followed by a question-and-answer session for the balance of the interview. Step Two - Request for Proposals (RFP): Following the establishment and ranking of the short-listed firms, the RFP documents will be issued to the short-listed firms. The short-listed firms shall submit their cost proposal in a sealed envelope, including their construction phase fee, lump sum cost for fulfilling the general conditions, cost of insurance and cost of performance and payment bonds, all in accordance with the step two provisions. The Preconstruction Services scope and fee will be negotiated following receipt of proposals, but prior to contract award. Upon the successful conclusion of the negotiation, the Preconstruction Services scope shall be included as provision D.2. and the Preconstruction Fee shall be included in provision D.5., both within the Agreement Between Owner and Construction Manager as Constructer. In addition to the information provided herein, a matrix detailing services to be included in each category will be issued in the RFP documents. All information submitted in Step One with respect to project specific organizational structure, staffing, and other selection criteria, in addition to the Step Two documents, shall establish the basis for Step Two pricing. Following contract award, the successful firm shall be required to provide, at a minimum, all staffing and services detailed in the firm's responses to selection criteria in step one and as otherwise required by the contract documents. The final selection of the construction manager at risk will be based on a 25,000 - point system. Fifty percent (50%) (12,500 points) will be awarded as established by the review panel based on qualifications, responses to the university's selection criteria, references, the Owner's prior experience with the respondent, and the interviews, all under a competitive process. Three hundred seventy-five (375) bonus points will be awarded to an SDVE proposer. The 375 bonus points will be added to the SDVE's qualifications score as established by the Owner's review panel. The 375 bonus points are available only to an SDVE firm submitting a proposal directly to the Owner.

Post-Bid

Medical

$15,150,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
25
Bidding Soon
346
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2024

May 27, 2025

img_map_placeholder

To Be Determined, Columbia, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.