Site work and paving for a mixed-use development in Bristol, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

Maple Beach Trail and Parking Improvements. Question Deadline 09/30/2024 at 4:00 PM ET Deadline to submit Questions online. All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer by clicking on the Questions tab within PennBid. INFORMATION CONCERNING OWNER AND ENGINEER Bristol Borough 250 Pond Street Bristol, PA 19007 Telephone: (215) 758-3828 Attention: James Dillion, Manager Email: jdillion@bristolboro.com Engineer: Gilmore & Associates, Inc. 12 Terry Drive, Suite 205 Newtown, PA 18940 Telephone: (215) 369-3955 Fax: (215) 345-8606 Attention: Kurt Schroeder, P.E. Email: kschroeder@gilmore-assoc.com Each bid shall be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to Bristol Borough along with an Agreement of Surety certifying that the required Performance and Payment Bonds will be provided to the Bidder. The successful Bidder shall be required to furnish proof of insurance and bonds for Performance, Payment, and Maintenance in such form as meets the approval of Bristol Borough and having as security thereon such Surety company or companies as are approved by Bristol Borough. A nominal fee of 0.33% of the bid amount (up to $5,000) is assessed only to bidders who are awarded contracts. For bidders who are not the winning bid; there are absolutely no fees. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act, as amended, and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry. The successful Bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. This project is subject to applicable provisions of Act 127, Pennsylvania Public Works Employment Verification, as amended. Project Description: This contract consists of a base bid and no alternate bids. The base bid involves the construction of trailhead improvements, including tree removal, asphalt trail construction and parking lot installation consisting of 2A Stone Subbase, Binder Course, and Wearing Course, ADA compliant curb ramps and parking spaces, concrete curbing, line striping, signage, and installation of stormwater management facilities. The items and quantities associated with the Base Bid are more fully defined in Section 01 22 00 Measurement and Payment. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. Bristol Borough reserves the right to reject any and all bids, or parts thereof, and to accept the bid, which it deems, in its sole judgment, to be in the best interest of the Borough. This project was financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority. FILE NO. 2023-05006

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

14

63

16

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Traffic Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
280
Bidding Soon
4,467
All Active Projects
2,153
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2024

November 4, 2024

img_map_placeholder

Maple Beach Rd, Bristol, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Maple Beach Trail and Parking Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.