BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Westminster, California. Completed plans call for site work for a playground / park / athletic field.

**As of October 23, 2024, This project has been awarded to Western State Builders, Inc., with the awarded amount of $1,503,645.48.** Playground Renovation for Bolsa Chica Park, Westminster Village Park, Bowling Green Park College Park, Russell C. Paris Park. Any questions regarding these specifications should be addressed to the Project Engineer, Cindy Huynh, at (714) 548-3497. The latest edition of the Standard Specifications for Public Works Construction (Green Book), including any supplements, is included by reference as a part of the Specifications for this project. The City of Westminster reserves the right to accept or reject any bids presented, to waive any irregularity and informality in the bids and bid process, and to retain all bids and guarantees for a period of sixty (60) days for examination and comparison, all as specified in the contract documents. At the time the bid is submitted, the Contractor shall possess a valid Class A or C Contractor's License. The bidder must also submit with their proposal a satisfactory certified or cashier's check certified by a responsible bank, cash, or bidder's bond on the City's bond form in favor of the City of Westminster, executed by an admitted surety insurer authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California, subject to approval of the City Attorney, in an amount equal to at least 10% of the amount bid. Document Note: An electronic version may be obtained upon payment, of Twenty-One Dollars and Seventy-Five Cents ($21.75) by emailing Veronica Johnson of Public Works Engineering at Vejohnson@westminster-ca.gov. The work shall be done in accordance with these plans and specifications. INSTALL NEW PLAY EQUIPMENT INSTALL NEW RUBBER PLAY SURFACING (10,304 SF) INSTALL NEW BENCHES (QTY. 4) The work consists of removing and disposing of the existing concrete flatwork, playground equipment, footing, sand, and rubber playground surface; performing site grading; installing new Portland cement concrete sidewalk, curb, playground equipment, rubber playground surface; and all appurtenant work in connection therewith

Award

Playgrounds / Parks / Athletic Fields

$1,503,645.00

Public - City

Site Work

37

5

3

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
115
Bidding Soon
2,426
All Active Projects
956
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

December 9, 2024

img_map_placeholder

Multiple Locations, Westminster, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.