BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in Boston, Massachusetts. Completed plans call for the renovation of a conference / convention center.

Awarding Authority: Project No.: Project Name: Project Location: Project Description: Massachusetts Convention Center Authority R33 RFQ Trade Contractor Prequalification - Hynes AHUs & Switchgears Upgrades (R33 AHU Project) 900 Boylston Street Boston, MA 02115 The MCCA is soliciting Trade Contractor Services for the Hyne's AHU and Switchgear Upgrades, which includes the complete replacement of the switchgear equipment. The Massachusetts Convention Center Authority (hereinafter the "Authority") is soliciting Trade Contractor Services for the Hynes AHUs and Switchgears Upgrades, a 9-phased approach will be to replace internal parts of the AHUs and the current control systems, as well as completely replace the switchboards, with an estimated cost of $35,000,000 located at 900 Boylston Street. Boston, MA. Switchgears Project Trade estimate $6,441,000. In accordance with Massachusetts General Laws, Chapter 149A, sections 1 thru 13, the Authority is seeking a highly qualified and competent Trade Contractors to provide services to implement the construction, between the Summer of 2024 through Spring of 2029. This Request for Qualifications ("RFQ") is the first phase of a two-phase procurement process as set forth in M.G.L. c.149A. The Authority is prequalifying firms interested in providing public Trade Contractor services for the project through this RFQ process. [Be advised that this process is only for the Switchgears scope of work only, (R33) estimated at $6,441,000]. Only those respondents deemed qualified will be invited to submit a proposal in response to a detailed Request for Bid ("RFB") which will be issued in the second phase of the procurement process. Questions or requests for information, clarification or interpretation of the Request for Qualifications documents must be submitted electronically to BidDocs ONLINE and must be received no later than 5:00 PM, September 27, 2024. Estimated Construction Cost: $6,441,000.00 Estimated Project Duration: 1,734 consecutive calendar days Owner's Project Manager: Massachusetts Convention Center Authority 415 Summer Street Boston, MA 02210 Phone: 617-954-2444 Prime Designer: STV Incorporated One Financial Center 3rd Floor Boston, MA 02111 Phone: 617-303-1135 MBE / WBE Goals: MBE - 6.9% WBE - 15.3% Project Specific Requirements: Proposers must complete the Similar Project Experience Form in BidDocs. Project will be completed using a 9-phase approach as part of the larger project to upgrade the Hynes Convention Center AHU & Switchgear equipment. The project duration will be over a five-year period utilizing the previously stated 9-phase approach.

GC Bidding

Conference / Convention Centers

$6,441,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
552
Active Projects
328
Bidding Soon
4,239
All Active Projects
1,808
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 9, 2024

June 6, 2025

March 6, 2030

img_map_placeholder

900 Boylston St, Boston, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.