Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a civil project in Naples, Florida. Conceptual plans call for the renovation of a water / sewer project.
The Wastewater Treatment Plant includes a "preliminary treatment process" that is designed to mechanically remove debris from the plant's influent waste stream in an effort to enhance and protect downstream treatment processes. The preliminary system consists of multiple pumps and equipment that are specifically designed in order to effectively (and successfully) achieve treatment standards. This request will account for the replacement of the actual grit removal components (two (2) grit pumps, two (2) cyclone classifiers, and a grit dewatering system) which are controlled by sophisticated timers and SCADA operations; the units can also be operated manually. This equipment and applicable piping have been in service for over 30 years and has reached its useful life, and now requires replacement. The new proposed equipment will be considered direct replacements of the existing equipment. This budget request accounts for both equipment and installation. As of September 20, 2024, this project is included in the city's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$300,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
2335 Crawford Ave, Naples, FL
Related To This Project
Naples, FL
Bid Date: Sep 02 2024
Naples, FL
Bid Date: Sep 06 2024
Naples, FL
Bid Date: Nov 08 2024
Naples, FL
Bid Date: Sep 23 2024
Naples, FL
Bid Date: Sep 12 2024
Naples, FL
Bid Date: Mar 28 2019
Construction of the South County Regional Water Treatment Plant (SCRWTP) Chlorine Scrubber - 3631892
Naples, FL
Bid Date: Apr 16 2019
Naples, FL
Bid Date: Sep 24 2024
Naples, FL
Bid Date: Nov 14 2024
Naples, FL
Bid Date: Sep 11 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.