BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Wolcott, Vermont. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and water / sewer project.

As of October 29, 2024, the project was awarded to Kingdom Timber LLC. - $4,117.50 LG Ferno Forest Products LLC - $37,642.00 with a total awarded amount of $41,759.50 July 2024 Storm Recovery Request for Bids: Excavation and Trucking Contractor Services: Repairs to Hines and West Hill Roads Contact for Information: Dillan Cafferky, Wolcott Road Foreman (802) 595-5577 Introduction: The Town of Wolcott ('Town') is requesting bids for repairs to Hines and West Hill Roads that sustained damage during the storm event of July 10-11, 2024. Repairs to be completed are specified in the scope of work below and will be funded by the Town. Please supply separate bids for each of the two roads. Contractor(s) awarded the job(s) will be required to sign a contract with the Town. Each road must be billed separately to meet FEMA requirements. Bids and invoices must itemize separately the work and materials for Class 3 and Class 4 roads. Scope of Work 1. Hines Road: Clean ditch as necessary, 6" minus stone, best fit: 2100 feet in length, ~8 ft wide, 3 feet deep Add ditching, best fit, no rock, grass: ~720 feet in length, 4.5 feet wide, 3 feet deep Add NEW culvert: Area of road affected for fill: 24" diameter, 60' length, best fit Add NEW culvert under a driveway: 24" diameter, 30' length, best fit Upsize four (4) culverts from 18" to 24": 40' length 2. West Hill Road: Culvert replacement; stone apron inlet and outlet; upgrade to 24", 40' length Clean ditch, best fit, no rock, grassy: 370' Specifications: Work must be completed by October 31, 2024. Work must be planned in consultation with Dillan Cafferky and comply with VT Municipal Road Standards. All materials (including culverts) will be billed directly to the Town of Wolcott. Contractor responsible for traffic control and appropriate signage.

Award

Water / Sewer

$41,759.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
78
Bidding Soon
1,382
All Active Projects
545
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

October 3, 2024

img_map_placeholder

Multiple Locations, Wolcott, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.