BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated November 18, 2025

Demolition, site work and renovation of a library in Corona, California. Completed plans call for the demolition of a library; for the renovation of a 13,315-square-foot, two-story above grade library; and for site work for a library.

Interior and Exterior remodel of the existing Library and Auxiliary Space including, but not limited to, demolition, renovation, construction of new rooms, mechanical, electrical, and plumbing, ceilings, lighting, HVAC, painting, flooring, etc., per the approved project plans and specifications in the unincorporated community of Home Gardens, Riverside County. Location 3785 S Neece St., Corona, CA 92879 Contract Time. Substantial Completion of the Work Must Be Achieved Within One Hundred Sixty (160) Calendar Days From the Date of Commencement. Final Completion Must Be Achieved Within Fifteen (15) Calendar Days After the Occurrence of Substantial Completion. Liquidated Damages. The Construction Contract Includes Provisions: (1) Permitting the County to Assess Liquidated Damages to the Contractor of One Thousand Dollars ($1,000) Per Day for Each Day After the Expiration of the Contract Time for Substantial Completion That the Work is Not Substantially Completed by Contractor; and (2) for Payment by County to Contractor of Liquidated Damages to Contractor of Eight Hundred Dollars ($800) Per Day for Each Day of Compensable Delay for Which Contractor is Entitled to a Contract Adjustment of the Contract Time and Contract Price. For Projects $200,000 or Over the Contractor Shall Submit a Bid Guarantee Bond in an Amount No Less Than 5% of the Total Contract Price, Along With the Bid. Performance and Payment Bonds. The Successful Bidder Will Be Required to Furnish: (1) a Performance Bond in the Form Included in the Bidding Documents Guaranteeing Faithful Performance of All Obligations Under the Construction Contract; and (2) a Payment Bond That Complies With the Requirements of Civil Code Section 9554 in the Form Included in the Bidding Documents. The Penal Sums of the Performance Bond and Payment Bond Shall Each Be Initially in the Amount of One Hundred Percent (100%) of the Contract Price. The Penal Sum Shall Be Increased for Contract Adjustments Increasing the Contract Price That Are Authorized by Change Order or Unilateral Change Orders. (352.065), 24618 Question Deadline 01/13/2025 at 5:00 PM PT All requests for clarification of the Bidding Documents must be submitted, in writing, between the hours of 8:00 a.m. and 5:00 p.m. on any Day, Monday through Thursday (except Holidays) up to, including and no later than the Three (3) Days prior to Bid Closing Deadline, by hand delivery, mail, fax or e-mail to the following: Office of Economic Development, Attention Benny Yeh, 3403 10 th Street, Suite 400, Riverside, CA 92501, or via email at byeh@rivco.org

Bid Results

Library

$1,050,000.00

Public - County

Demolition, Renovation, Site Work

64

8

85

5

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
610
Active Projects
234
Bidding Soon
3,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2025

March 3, 2025

Project location map

3785 S Neece St, Corona, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.