Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Lula, Georgia. Completed plans call for site work for a water / sewer project.
Question Deadline 10/18/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than 72 hours prior to the date for opening of Bids may not be answered The time allowed for Substantial Completion from the date of Notice to Proceed is 90 consecutive calendar days. The project has a maximum time for total completion which shall not exceed 120 consecutive calendar days from the starting date specified in the Notice to Proceed. Each Bid must be accompanied by a Bid Bond with good and sufficient surety or sureties approved by the Owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the Owner in an amount equivalent to five percent (5%) of the total amount payable by the terms of the Contract or, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. The Successful Bidder will be required to furnish performance and payment bonds with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement. Surety and insurance companies must be listed in the Federal Registry of Insurance Companies Circular 570, holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia. All Bids will remain subject to acceptance for 30 days after the day of the Bid Opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date. This project consists of two project areas and multiple options per area. The approximate extent and character of the Work is generally described as follows: Carter Street A-1: This design consists of the replacement of an existing 42" CMP storm drain pipe with 64 Linear Feet (LF) of 66" RCP and two concrete headwalls. This option also includes 760 Square Feet (SF) of asphalt replacement, tree removal, and the removal of an existing 15" RCP. Carter Street A-2: This design consists of the replacement of an existing 42" CMP storm drain pipe with 64 Linear Feet (LF) of 6' X 5' box culvert and two headwalls. This option also includes 760 Square Feet (SF) of asphalt replacement, tree removal, and the removal of an existing 15" RCP. Chattahoochee Street B-1: This design consists of the removal of existing 24" PVC and 24" RCP storm drain pipes, Concrete Flume, and Concrete Apron. This will be replaced with 59 Linear Feet (LF) of double barrel 34" X 53" elliptical RCP, one straight headwall, one concrete headwall, and one concrete spillway. This option also includes 1,163 Square Feet (SF) of asphalt replacement and tree removal. Chattahoochee Street B-2: This design consists of the removal of existing 24" PVC and 24" RCP storm drain pipes, Concrete Flume, and Concrete Apron. This will be replaced with 59 Linear Feet (LF) of double barrel 34" X 53" elliptical RCP, 37 Linear Feet (LF) of double barrel 36" RCP, one straight headwall, three concrete headwalls, and one concrete spillway. This option also includes 1,163 Square Feet (SF) of asphalt replacement and tree removal. Chattahoochee Street B-3: This design consists of the removal of existing 24" PVC and 24" RCP storm drain pipes, Concrete Flume, and Concrete Apron. This will be replaced with 59 Linear Feet (LF) of double barrel 34" X 53" elliptical RCP, 43 Linear Feet (LF) of double barrel 36" RCP, a double grate inlet precast structure with two 6 Linear Feet (LF) 30" RCP pipes, two flared end sections, and two concrete headwalls. This option also includes 1,163 Square Feet (SF) of asphalt replacement and tree removal. The Owner reserves the right to reject any or all Bids, to waive formalities, and to re-advertise.
Post-Bid
Water / Sewer
$200,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2024
November 21, 2024
Multiple Locations, Lula, GA
Related To This Project
Lula, GA
Bid Date: May 09 2024
Lula, GA
Bid Date: May 09 2024
Lula, GA
Bid Date: Oct 24 2023
Lula, GA
Bid Date: Jan 23 2020
Lula, GA
Bid Date: Sep 05 2023
Lula, GA
Bid Date: Sep 05 2023
Lula, GA
--
Lula, GA
Bid Date: Mar 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.