Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in East Alton, Illinois. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Village of East Alton Josh Curren, Village Treasurer 119 W. Main Street East Alton, Il 62024The Village is currently pursuing project funding from IEPA for upgrades to its water treatment plant that consist of the following key upgrades: * Provide Treatment for PFAS. * Provide upgrades to the Village's old 1.5 MGD Water Treatment Plant - new aerator, replace clarifier, replace Greenleaf filters & new chemical feed systems and controls. * Replace existing pumps with new VFD pumps - High Service and Backwash Pumps * Upgrade the existing pebble lime feed system with a new hydrate lime system. * Extensive site piping * Extensive rehab painting of the existing plant treatment units. This is a high priority project for the Village as PFAS has a newly mandated USEPA and IEPA MCL that currently exceeds the water quality currently produced at the Water Plant. The Village must be able to provide full PFAS treatment by 2029. To request additional information, please contact either: Mike Moore, Public Works Director (O): 618-259-7615 (E): mmoore@villageofeastaltonil.gov Josh Curren, Village Treasurer (O): 618-259-6214 (E): jcurren@villageofeastaltonil.gov
Post-Bid
Water / Sewer
$200,000.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2024
November 20, 2024
To Be Determined, East Alton, IL
Related To This Project
East Alton, IL
Bid Date: Dec 03 2024
East Alton, IL
Bid Date: Sep 29 2020
East Alton, IL
Bid Date: Apr 16 2024
East Alton, IL
Bid Date: Apr 15 2024
East Alton, IL
Bid Date: Apr 05 2024
East Alton, IL
Bid Date: Feb 13 2024
East Alton, IL
--
East Alton, IL
Bid Date: Jan 29 2024
East Alton, IL
Bid Date: Jan 12 2024
East Alton, IL
--
East Alton, IL
Bid Date: Nov 03 2023
East Alton, IL
Bid Date: Nov 17 2023
East Alton, IL
Bid Date: Nov 17 2023
East Alton, IL
Bid Date: Nov 01 2023
East Alton, IL
Bid Date: Mar 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.