Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Renovation of a transportation facility in East Alton, Illinois. Completed plans call for the renovation of a 3,070-square-foot transportation facility.
**As of May 08, 2025, the project was awarded to Bethalto Floor Store, with an awarded amount of $16,435.95.** Reference Number 0000379953 The Authority owns an existing facility containing approximately 2,400 square feet of carpet and approximately 750 feet of vinyl flooring installed over a concrete slab. This project will remove all flooring determined by the Authority (approximately 3,070 square feet) and replace with a product(s) selected by the Authority. Installation shall be provided by the Vendor along with methods of disposal of existing material and any related scrap. The Vendor shall be responsible for any damages during installation. job location : Delivery Point 8 Terminal Drive East Alton, Illinois United States 62024 Question Deadline 04/02/2025 at 2:00 PM CT Questions are submitted online No This RFP is intended to create a fair and reasonable method for obtaining responses from interested parties. By issuing this RFP, the Authority is not obligated to enter into an agreement with any of the interested consultants. The Authority reserves the right to accept or reject any and all proposals submitted and to waive any and/or all irregularities pertaining to the submission of proposals. Prevailing wage must be included in any provided proposal along with itemized breakdown of services. The selected Vendor must be licensed to perform this work. All questions can be directed to Crystal Geisen, at the contact information below. General Requirements - Installation Required - Insurance Required - Prevailing Wage Required St. Louis Regional Airport will look for the Vendor to provide services to include, but not limited to: Evaluation of flooring options with final product(s) to be selected by the Authority Removal of existing flooring material as determined by the Authority Installation of new flooring material, and associated items relevant to the flooring installation o Approximately 2,500 square feet of carpet o Approximately 570 square feet of luxury vinyl plank flooring Disposal of all existing floor materials and any waste from the installation in a manner off-site Compliance with all applicable federal, state, and local regulations
Award
Transportation Terminals
$16,436.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
May 5, 2025
8 Terminal Dr, East Alton, IL
Related To This Project
East Alton, IL
Bid Date: Apr 25 2025
East Alton, IL
Bid Date: Jul 09 2025
East Alton, IL
Bid Date: Jul 03 2025
East Alton, IL
Bid Date: Jul 14 2025
East Alton, IL
Bid Date: Aug 19 2025
East Alton, IL
--
East Alton, IL
Bid Date: Sep 04 2025
East Alton, IL
Bid Date: Oct 15 2025
East Alton, IL
Bid Date: Apr 04 2025
East Alton, IL
Bid Date: Apr 04 2025
East Alton, IL
Bid Date: Apr 04 2025
East Alton, IL
--
East Alton, IL
Bid Date: Mar 11 2025
East Alton, IL
Bid Date: Dec 03 2024
East Alton, IL
Bid Date: Oct 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
